Difference between revisions of "Run Planning Meeting Notes, Nov 14-Nov 21, 2018"

From GlueXWiki
Jump to: navigation, search
(Friday, Nov 16 at 08:45)
Line 14: Line 14:
 
*[https://halldweb.jlab.org/wiki/index.php/File:Fall18_week9.jpg Hall D schedule for week 9]
 
*[https://halldweb.jlab.org/wiki/index.php/File:Fall18_week9.jpg Hall D schedule for week 9]
 
*[https://halldweb.jlab.org/wiki/images/9/90/Fall18_week10.jpg Hall D schedule for week 10]
 
*[https://halldweb.jlab.org/wiki/images/9/90/Fall18_week10.jpg Hall D schedule for week 10]
 +
 +
== Monday, Nov 19 at 08:45 ==
 +
 +
#Last 72h:
 +
#* Friday Morning: Optic optimization
 +
#* [https://logbooks.jlab.org/entry/3627249 TAC run] (Alexander S.)
 +
#* Empty target run+ raw mode run
 +
#* Standard production running
 +
#Issues
 +
#* [ Rate are significantly lower after beam optimization. Diamond orientation dependence] (Alexandre D.)
 +
#* [https://logbooks.jlab.org/entry/3627399 GONI camera is not communicating] (Hovanes)
 +
#Reports
 +
#* [Monitoring report] (Thomas)
 +
#Plans
 +
#* [https://halldweb.jlab.org/wiki/images/8/84/Fall18_week9.jpg Time chart for this week]
 +
#* Standard production running
 +
#Discussion ComCal commissioning
 +
#* [https://halldweb.jlab.org/wiki/index.php/File:Run_Plan_Fall_2018-v3c.jpg Latest runplan (V.3c) ]
 +
#* Time chart, updated after 11/15/2018 discussion
 +
#** [https://halldweb.jlab.org/wiki/images/c/ca/Fall18_week11.jpg Week 11]
 +
#**  [https://halldweb.jlab.org/wiki/images/8/8b/Fall18_week12.jpg Week 12]
 +
#** [https://halldweb.jlab.org/wiki/images/5/50/Fall18_week13.jpg Week 13]
 +
#Notes
 +
#*No meetings this week end.
  
 
== Friday, Nov 16 at 08:45 ==
 
== Friday, Nov 16 at 08:45 ==

Revision as of 07:16, 17 November 2018

<- Back to Run Coordination Meetings:Fall2018 Run


Monday, Nov 19 at 08:45

  1. Last 72h:
    • Friday Morning: Optic optimization
    • TAC run (Alexander S.)
    • Empty target run+ raw mode run
    • Standard production running
  2. Issues
  3. Reports
    • [Monitoring report] (Thomas)
  4. Plans
  5. Discussion ComCal commissioning
  6. Notes
    • No meetings this week end.

Friday, Nov 16 at 08:45

  1. Last 24h:
    • Check V-wire rate in preparation for TAC on Friday. (Alexander S.)
    • Check issue with CBrem gui. It appears to be gone (Hovanes)
    • Maintenance: 1pm-4/5pm.
    • Standard production running
  2. Issues
  3. Reports
  4. Plans
    • Time chart for this week
    • Optics adjustment (Todd/Jay) 30 min.
    • TAC run this morning/afternoon.
    • Standard production running over the week end.
  5. Discussion ComCal commissioning
  6. Notes
    • No meetings this week end.

Thursday, Nov 15 at 08:45

  1. Last 24h:
    • Standard production running
  2. Issues
  3. Reports
  4. Plans
    • Monday maintenance is moved to today, 1pm-4/5pm.
    • Check V-wire position wrt beam (Sacha).
    • Investigate issue with CBrem gui. Meanwhile, fill the target.
    • Production running, starting with amorphous (for CBrem ref.)
    • Optics adjustment (Todd/Jay) 30 min.
      • Access to move back the flux monitor
      • Other access?
    • TAC run this morning/afternoon is postponed.
    • Optics adjustment (Todd/Jay) 30 min.
  5. Discussion ComCal commissioning
  6. Notes