(Monday, Nov 19 at 08:45)
(Monday, Nov 19 at 08:45)
Line 31: Line 31:
 
#Reports
 
#Reports
 
#* [http://zeus.phys.uconn.edu/halld/cobrems/harptool.cgi Richard made is tool to compute the beam profile available for general use.]
 
#* [http://zeus.phys.uconn.edu/halld/cobrems/harptool.cgi Richard made is tool to compute the beam profile available for general use.]
#* [Monitoring report] (Thomas)  
+
#* [https://logbooks.jlab.org/entry/3628424 Monitoring report] (Thomas)  
 
#Plans
 
#Plans
 
#* [https://halldweb.jlab.org/wiki/images/8/84/Fall18_week9.jpg Time chart for this week]
 
#* [https://halldweb.jlab.org/wiki/images/8/84/Fall18_week9.jpg Time chart for this week]

Revision as of 09:34, 19 November 2018

<- Back to Run Coordination Meetings:Fall2018 Run


Monday, Nov 19 at 08:45

  1. Last 72h:
    • Friday Morning: Optic optimization
    • TAC run (Alexander S.)
    • Empty target run+ raw mode run
    • Standard production running
  2. Issues
  3. Reports
  4. Plans
  5. Discussion ComCal commissioning
  6. Notes
    • No meetings this week end.

Friday, Nov 16 at 08:45

  1. Last 24h:
    • Check V-wire rate in preparation for TAC on Friday. (Alexander S.)
    • Check issue with CBrem gui. It appears to be gone (Hovanes)
    • Maintenance: 1pm-4/5pm.
    • Standard production running
  2. Issues
  3. Reports
  4. Plans
    • Time chart for this week
    • Optics adjustment (Todd/Jay) 30 min.
    • TAC run this morning/afternoon.
    • Standard production running over the week end.
  5. Discussion ComCal commissioning
  6. Notes
    • No meetings this week end.

Thursday, Nov 15 at 08:45

  1. Last 24h:
    • Standard production running
  2. Issues
  3. Reports
  4. Plans
    • Monday maintenance is moved to today, 1pm-4/5pm.
    • Check V-wire position wrt beam (Sacha).
    • Investigate issue with CBrem gui. Meanwhile, fill the target.
    • Production running, starting with amorphous (for CBrem ref.)
    • Optics adjustment (Todd/Jay) 30 min.
      • Access to move back the flux monitor
      • Other access?
    • TAC run this morning/afternoon is postponed.
    • Optics adjustment (Todd/Jay) 30 min.
  5. Discussion ComCal commissioning
  6. Notes