(Monday, Nov 19 at 08:45)
(Monday, Nov 19 at 08:45)
Line 23: Line 23:
 
#* Standard production running
 
#* Standard production running
 
#Issues
 
#Issues
#* [Rate are significantly lower after beam optimization. Diamond orientation dependence] (Alexandre D.). This is due to bad beam profile: The optimization done on Friday by Todd S. did not last:
+
#* [https://logbooks.jlab.org/entry/3627619 Rate are significantly lower after beam optimization. Diamond orientation dependence] (Alexandre D.). This is due to bad beam profile: The optimization done on Friday by Todd S. did not last:
 
#**[https://logbooks.jlab.org/entry/3627155 Harp result for Friday after the optimization]
 
#**[https://logbooks.jlab.org/entry/3627155 Harp result for Friday after the optimization]
 
#**Harps result for Saturday [https://logbooks.jlab.org/entry/3627661 1], [https://logbooks.jlab.org/entry/3627915 2]  
 
#**Harps result for Saturday [https://logbooks.jlab.org/entry/3627661 1], [https://logbooks.jlab.org/entry/3627915 2]  
Line 34: Line 34:
 
#Plans
 
#Plans
 
#* [https://halldweb.jlab.org/wiki/images/8/84/Fall18_week9.jpg Time chart for this week]
 
#* [https://halldweb.jlab.org/wiki/images/8/84/Fall18_week9.jpg Time chart for this week]
#* 30 min FCal scan? (A. Somov)   
+
#* 30 min FCal scan (A. Somov
 +
#* 2pm: optic optimization (T. Satogata)   
 
#* Standard production running  
 
#* Standard production running  
 
#Discussion ComCal commissioning
 
#Discussion ComCal commissioning
Line 43: Line 44:
 
#** [https://halldweb.jlab.org/wiki/images/5/50/Fall18_week13.jpg Week 13]
 
#** [https://halldweb.jlab.org/wiki/images/5/50/Fall18_week13.jpg Week 13]
 
#Notes
 
#Notes
#*No meetings this week end.
 
  
 
== Friday, Nov 16 at 08:45 ==
 
== Friday, Nov 16 at 08:45 ==

Revision as of 11:03, 19 November 2018

<- Back to Run Coordination Meetings:Fall2018 Run


Monday, Nov 19 at 08:45

  1. Last 72h:
    • Friday Morning: Optic optimization
    • TAC run (Alexander S.)
    • Empty target run+ raw mode run
    • Standard production running
  2. Issues
  3. Reports
  4. Plans
    • Time chart for this week
    • 30 min FCal scan (A. Somov)
    • 2pm: optic optimization (T. Satogata)
    • Standard production running
  5. Discussion ComCal commissioning
  6. Notes

Friday, Nov 16 at 08:45

  1. Last 24h:
    • Check V-wire rate in preparation for TAC on Friday. (Alexander S.)
    • Check issue with CBrem gui. It appears to be gone (Hovanes)
    • Maintenance: 1pm-4/5pm.
    • Standard production running
  2. Issues
  3. Reports
  4. Plans
    • Time chart for this week
    • Optics adjustment (Todd/Jay) 30 min.
    • TAC run this morning/afternoon.
    • Standard production running over the week end.
  5. Discussion ComCal commissioning
  6. Notes
    • No meetings this week end.

Thursday, Nov 15 at 08:45

  1. Last 24h:
    • Standard production running
  2. Issues
  3. Reports
  4. Plans
    • Monday maintenance is moved to today, 1pm-4/5pm.
    • Check V-wire position wrt beam (Sacha).
    • Investigate issue with CBrem gui. Meanwhile, fill the target.
    • Production running, starting with amorphous (for CBrem ref.)
    • Optics adjustment (Todd/Jay) 30 min.
      • Access to move back the flux monitor
      • Other access?
    • TAC run this morning/afternoon is postponed.
    • Optics adjustment (Todd/Jay) 30 min.
  5. Discussion ComCal commissioning
  6. Notes