Difference between revisions of "Run Planning Meeting Notes, Nov 21-Nov 28, 2018"
From GlueXWiki
(→Friday, Nov 23 at 10:00) |
|||
Line 19: | Line 19: | ||
# Since Wednesday | # Since Wednesday | ||
− | #* Start with luminosity scan. | + | #* Start with luminosity scan (scratched transmission optimization). |
#* First part complete: Amo and Diamond up to 300nA beam, Mode 9 and 10(raw) | #* First part complete: Amo and Diamond up to 300nA beam, Mode 9 and 10(raw) | ||
#* Continue with data production | #* Continue with data production |
Revision as of 10:00, 23 November 2018
<- Back to Run Coordination Meetings:Fall2018 Run
- Trigger graphs
- Trigger Spreadsheet
- Low energy running Trigger Spreadsheet
- Run Plan Google Calendar
- Accel. Plan Google Calendar
- Acc whiteboard
- Counting house whiteboard
- Hall D schedule for week 8
- Hall D schedule for week 9
Friday, Nov 23 at 10:00
- Its Black Friday!
- Since Wednesday
- Start with luminosity scan (scratched transmission optimization).
- First part complete: Amo and Diamond up to 300nA beam, Mode 9 and 10(raw)
- Continue with data production
- Thursday early morning, major beam down due to communication failure to RF chassis (pc104 cpu).
- Major power glitch "Brown out", caused down on Friday early morning, and RF separator issues.
- generally quite a rocky data taking period.
- Run Plan
- continue production data taking nominal sequence with nominal beam current
- high luminosity test (red program) when Sasha is available (Friday or Saturday)
- any other requests for studies before beam goes away on Monday morning???