Line 23: Line 23:
 
#* Continue with data production
 
#* Continue with data production
 
#* Thursday early morning, major beam down due to communication failure to RF chassis (pc104 cpu).
 
#* Thursday early morning, major beam down due to communication failure to RF chassis (pc104 cpu).
#* Major power glitch "Brown out", caused down on Friday early morning.
+
#* Major power glitch "Brown out", caused down on Friday early morning, and RF separator issues.
 +
#* generally quite a rocky data taking period.
 +
# Run Plan
 +
#* continue production data taking nominal sequence with nominal beam current
 +
#* high luminosity test(red program [https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit#gid=1035143529]) when Sasha is available (Friday or Saturday)

Revision as of 09:58, 23 November 2018

<- Back to Run Coordination Meetings:Fall2018 Run



Friday, Nov 23 at 10:00

  • Its Black Friday!
  1. Since Wednesday
    • Start with luminosity scan.
    • First part complete: Amo and Diamond up to 300nA beam, Mode 9 and 10(raw)
    • Continue with data production
    • Thursday early morning, major beam down due to communication failure to RF chassis (pc104 cpu).
    • Major power glitch "Brown out", caused down on Friday early morning, and RF separator issues.
    • generally quite a rocky data taking period.
  2. Run Plan
    • continue production data taking nominal sequence with nominal beam current
    • high luminosity test(red program [1]) when Sasha is available (Friday or Saturday)