Difference between revisions of "Run Planning Meeting Notes, Nov 21-Nov 28, 2018"

From GlueXWiki
Jump to: navigation, search
Line 28: Line 28:
 
#* continue production data taking nominal sequence with nominal beam current
 
#* continue production data taking nominal sequence with nominal beam current
 
#* high luminosity test ([https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit#gid=1035143529 red program]) when Sasha is available (Friday or Saturday)
 
#* high luminosity test ([https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit#gid=1035143529 red program]) when Sasha is available (Friday or Saturday)
 +
#* any other requests for studies before beam goes away on Monday morning???

Revision as of 10:00, 23 November 2018

<- Back to Run Coordination Meetings:Fall2018 Run



Friday, Nov 23 at 10:00

  • Its Black Friday!
  1. Since Wednesday
    • Start with luminosity scan.
    • First part complete: Amo and Diamond up to 300nA beam, Mode 9 and 10(raw)
    • Continue with data production
    • Thursday early morning, major beam down due to communication failure to RF chassis (pc104 cpu).
    • Major power glitch "Brown out", caused down on Friday early morning, and RF separator issues.
    • generally quite a rocky data taking period.
  2. Run Plan
    • continue production data taking nominal sequence with nominal beam current
    • high luminosity test (red program) when Sasha is available (Friday or Saturday)
    • any other requests for studies before beam goes away on Monday morning???