Difference between revisions of "Run Planning Meeting Notes, Nov 21-Nov 28, 2018"

From GlueXWiki
Jump to: navigation, search
(Friday, Nov 23 at 10:00)
Line 13: Line 13:
 
*[https://halldweb.jlab.org/wiki/index.php/File:Fall18_week8.jpg Hall D schedule for week 8]
 
*[https://halldweb.jlab.org/wiki/index.php/File:Fall18_week8.jpg Hall D schedule for week 8]
 
*[https://halldweb.jlab.org/wiki/index.php/File:Fall18_week9.jpg Hall D schedule for week 9]
 
*[https://halldweb.jlab.org/wiki/index.php/File:Fall18_week9.jpg Hall D schedule for week 9]
 +
 +
== Monday, Nov 26 at 8:45 ==
 +
 +
# Week End running
 +
#* Lumi scan continued and completed
 +
#* High lumi test done (Sasha)
 +
#* DAQ tests done (Sergey)
 +
#* Production data taken
 +
#* GLUEX E12-06-102 COMPLETE! THANKS TO EVERYBODY!
 +
# Reports:
 +
#* [https://logbooks.jlab.org/entry/3631668 monitoring]
 +
# Plans This Week
 +
#* installation of COMPCAL
 +
#* solenod ramp down, off for the reminder of the year
 +
#* shifts canceled till Thursday morning 8am.
 +
#* HallD will use the A-slit (only 3 halls(B,C,D) will be running)
 +
# AOB
  
  

Revision as of 09:33, 26 November 2018

<- Back to Run Coordination Meetings:Fall2018 Run


Monday, Nov 26 at 8:45

  1. Week End running
    • Lumi scan continued and completed
    • High lumi test done (Sasha)
    • DAQ tests done (Sergey)
    • Production data taken
    • GLUEX E12-06-102 COMPLETE! THANKS TO EVERYBODY!
  2. Reports:
  3. Plans This Week
    • installation of COMPCAL
    • solenod ramp down, off for the reminder of the year
    • shifts canceled till Thursday morning 8am.
    • HallD will use the A-slit (only 3 halls(B,C,D) will be running)
  4. AOB


Friday, Nov 23 at 10:00

  • Its Black Friday!
  1. Since Wednesday
    • Start with luminosity scan (scratched transmission optimization).
    • First part complete: Amo and Diamond up to 300nA beam, Mode 9 and 10(raw)
    • Continue with data production
    • Thursday early morning, major beam down due to communication failure to RF chassis (pc104 cpu).
    • Major power glitch "Brown out", caused down on Friday early morning, and RF separator issues.
    • generally quite a rocky data taking period.
    • general data quality looks reasonable.
  2. Run Plan
    • continue production data taking nominal sequence with nominal beam current
    • high luminosity test (red program) when Sasha is available (Friday or Saturday)
    • any other requests for studies before beam goes away on Monday morning???
    • we do NOT have a low current (50nA) thinnest amo (1e-5)
  3. AOB