Difference between revisions of "Run Planning Meeting Notes, Nov 29-Dec 6, 2018"
From GlueXWiki
(→Wednesday, Nov 28 at 8:45) |
(→Wednesday, Nov 28 at 8:45) |
||
Line 6: | Line 6: | ||
# First sight of beam (by Comp Cal) | # First sight of beam (by Comp Cal) | ||
# Swing and Overnight Running | # Swing and Overnight Running | ||
− | #* 15 nA on Al V-wire [https://logbooks.jlab.org/entry/3633248 running condition]. | + | #* 15 nA on Al V-wire ([https://logbooks.jlab.org/entry/3633248 full running condition]). |
#* Lost beam around 2pm (due to radiation damaged valve position sensor). | #* Lost beam around 2pm (due to radiation damaged valve position sensor). | ||
# FCAL is down: | # FCAL is down: |
Revision as of 09:30, 30 November 2018
Wednesday, Nov 28 at 8:45
- Cryo
- solenoid helium fill test this morning
- Comp Cal installation
- Completed at 6pm yesterday
- First sight of beam (by Comp Cal)
- Swing and Overnight Running
- 15 nA on Al V-wire (full running condition).
- Lost beam around 2pm (due to radiation damaged valve position sensor).
- FCAL is down:
- Rapid access is arrange between 10am - noon.
- Run Plan: