Difference between revisions of "Run Planning Meeting Notes, Nov 29-Dec 6, 2018"
From GlueXWiki
(→Wednesday, Nov 28 at 8:45) |
(→Wednesday, Nov 28 at 8:45) |
||
Line 1: | Line 1: | ||
== Wednesday, Nov 28 at 8:45 == | == Wednesday, Nov 28 at 8:45 == | ||
− | |||
− | |||
# Comp Cal installation | # Comp Cal installation | ||
#* Completed at 6pm yesterday | #* Completed at 6pm yesterday | ||
# First sight of beam (by Comp Cal) | # First sight of beam (by Comp Cal) | ||
+ | # https://logbooks.jlab.org/entry/3633247 | ||
# Swing and Overnight Running | # Swing and Overnight Running | ||
#* 15 nA on Al V-wire ([https://logbooks.jlab.org/entry/3633248 full running condition]). | #* 15 nA on Al V-wire ([https://logbooks.jlab.org/entry/3633248 full running condition]). | ||
Line 12: | Line 11: | ||
# Run Plan: | # Run Plan: | ||
#* | #* | ||
+ | # Cryo | ||
+ | #* solenoid helium fill test this morning |
Revision as of 09:31, 30 November 2018
Wednesday, Nov 28 at 8:45
- Comp Cal installation
- Completed at 6pm yesterday
- First sight of beam (by Comp Cal)
- https://logbooks.jlab.org/entry/3633247
- Swing and Overnight Running
- 15 nA on Al V-wire (full running condition).
- Lost beam around 2pm (due to radiation damaged valve position sensor).
- FCAL is down:
- Rapid access is arrange between 10am - noon.
- Run Plan:
- Cryo
- solenoid helium fill test this morning