Difference between revisions of "Run Planning Meeting Notes, Nov 29-Dec 6, 2018"
From GlueXWiki
(→Wednesday, Nov 28 at 8:45) |
(→Wednesday, Nov 28 at 8:45) |
||
Line 2: | Line 2: | ||
# Comp Cal installation | # Comp Cal installation | ||
#* Completed at 6pm yesterday | #* Completed at 6pm yesterday | ||
− | # First sight of beam (by Comp Cal) | + | # First sight of beam (by Comp Cal): https://logbooks.jlab.org/entry/3633247 |
− | + | ||
# Swing and Overnight Running | # Swing and Overnight Running | ||
#* 15 nA on Al V-wire ([https://logbooks.jlab.org/entry/3633248 full running condition]). | #* 15 nA on Al V-wire ([https://logbooks.jlab.org/entry/3633248 full running condition]). |
Revision as of 09:31, 30 November 2018
Wednesday, Nov 28 at 8:45
- Comp Cal installation
- Completed at 6pm yesterday
- First sight of beam (by Comp Cal): https://logbooks.jlab.org/entry/3633247
- Swing and Overnight Running
- 15 nA on Al V-wire (full running condition).
- Lost beam around 2pm (due to radiation damaged valve position sensor).
- FCAL is down:
- Rapid access is arrange between 10am - noon.
- Run Plan:
- Cryo
- solenoid helium fill test this morning