(Wednesday, Nov 28 at 8:45)
(Wednesday, Nov 28 at 8:45)
Line 7: Line 7:
 
#* Lost beam around 2pm (due to radiation damaged valve position sensor).
 
#* Lost beam around 2pm (due to radiation damaged valve position sensor).
 
# FCAL is down:
 
# FCAL is down:
 +
#* [Monitoring current draw on CAN bus https://logbooks.jlab.org/entry/3633312] [Matt]
 
#* Rapid access is arrange between 10am - noon.
 
#* Rapid access is arrange between 10am - noon.
 
# Run Plan:
 
# Run Plan:

Revision as of 09:35, 30 November 2018

Wednesday, Nov 28 at 8:45

  1. Comp Cal installation
    • Completed at 6pm yesterday
  2. First sight of beam (by Comp Cal): https://logbooks.jlab.org/entry/3633247
  3. Swing and Overnight Running
    • 15 nA on Al V-wire (full running condition).
    • Lost beam around 2pm (due to radiation damaged valve position sensor).
  4. FCAL is down:
  5. Run Plan:
  6. Cryo
    • solenoid helium fill test this morning