#* Rapid access is arrange between 10am - noon. | #* Rapid access is arrange between 10am - noon. | ||
# Run Plan: | # Run Plan: | ||
− | #* | + | #* https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2018-v5.pdf |
+ | #* Beam requested today: 2nA on the foil. | ||
# Cryo | # Cryo | ||
#* solenoid helium fill test this morning: https://logbooks.jlab.org/entry/3633314 | #* solenoid helium fill test this morning: https://logbooks.jlab.org/entry/3633314 |
Revision as of 09:39, 30 November 2018
Wednesday, Nov 28 at 8:45
- Comp Cal installation
- Completed at 6pm yesterday
- First sight of beam (by Comp Cal): https://logbooks.jlab.org/entry/3633247
- Swing and Overnight Running
- 15 nA on Al V-wire (full running condition).
- Lost beam around 2pm (due to radiation damaged valve position sensor).
- FCAL is down:
- Monitoring current draw on CAN bus [Matt]
- Rapid access is arrange between 10am - noon.
- Run Plan:
- https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2018-v5.pdf
- Beam requested today: 2nA on the foil.
- Cryo
- solenoid helium fill test this morning: https://logbooks.jlab.org/entry/3633314