(Wednesday, Nov 28 at 8:45)
(Wednesday, Nov 28 at 8:45)
Line 10: Line 10:
 
#* Rapid access is arrange between 10am - noon.
 
#* Rapid access is arrange between 10am - noon.
 
# Run Plan:
 
# Run Plan:
#*
+
#* https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2018-v5.pdf
 +
#* Beam requested today: 2nA on the foil.
 
# Cryo
 
# Cryo
 
#* solenoid helium fill test this morning: https://logbooks.jlab.org/entry/3633314
 
#* solenoid helium fill test this morning: https://logbooks.jlab.org/entry/3633314

Revision as of 09:39, 30 November 2018

Wednesday, Nov 28 at 8:45

  1. Comp Cal installation
    • Completed at 6pm yesterday
  2. First sight of beam (by Comp Cal): https://logbooks.jlab.org/entry/3633247
  3. Swing and Overnight Running
    • 15 nA on Al V-wire (full running condition).
    • Lost beam around 2pm (due to radiation damaged valve position sensor).
  4. FCAL is down:
  5. Run Plan:
  6. Cryo