Difference between revisions of "Run Planning Meeting Notes, Nov 29-Dec 6, 2018"

From GlueXWiki
Jump to: navigation, search
(Wednesday, Nov 28 at 8:45)
(Wednesday, Nov 28 at 8:45)
Line 1: Line 1:
== Wednesday, Nov 28 at 8:45 ==
+
==Friday, Nov 30 at 8:45 ==
 
# Comp Cal installation
 
# Comp Cal installation
 
#* Completed at 6pm yesterday
 
#* Completed at 6pm yesterday

Revision as of 09:45, 30 November 2018

Friday, Nov 30 at 8:45

  1. Comp Cal installation
    • Completed at 6pm yesterday
  2. First sight of beam (by Comp Cal): https://logbooks.jlab.org/entry/3633247
  3. Swing and Overnight Running
    • 15 nA on Al V-wire (full running condition).
    • Lost beam around 2pm (due to radiation damaged valve position sensor).
  4. FCAL is down:
  5. Run Plan:
  6. Cryo