Difference between revisions of "Run Planning Meeting Notes, Nov 29-Dec 6, 2018"
From GlueXWiki
(→Wednesday, Nov 28 at 8:45) |
(→Friday, Nov 30 at 8:45) |
||
Line 5: | Line 5: | ||
# Swing and Overnight Running | # Swing and Overnight Running | ||
#* 15 nA on Al V-wire ([https://logbooks.jlab.org/entry/3633248 full running condition]). | #* 15 nA on Al V-wire ([https://logbooks.jlab.org/entry/3633248 full running condition]). | ||
− | #* Lost beam around | + | #* Lost beam around 2am (due to radiation damaged valve position sensor). |
# FCAL is down: | # FCAL is down: | ||
#* [https://logbooks.jlab.org/entry/3633312 Monitoring current draw on CAN bus] [Matt] | #* [https://logbooks.jlab.org/entry/3633312 Monitoring current draw on CAN bus] [Matt] |
Revision as of 10:11, 30 November 2018
Friday, Nov 30 at 8:45
- Comp Cal installation
- Completed at 6pm yesterday
- First sight of beam (by Comp Cal): https://logbooks.jlab.org/entry/3633247
- Swing and Overnight Running
- 15 nA on Al V-wire (full running condition).
- Lost beam around 2am (due to radiation damaged valve position sensor).
- FCAL is down:
- Monitoring current draw on CAN bus [Matt]
- Rapid access is arrange between 10am - noon.
- Run Plan:
- https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2018-v5.pdf
- Beam requested today: 2nA on the foil.
- Cryo
- solenoid helium fill test this morning: https://logbooks.jlab.org/entry/3633314