==Friday, Nov 30 at 8:45 ==
+
 
# Comp Cal installation
+
#* Completed at 6pm yesterday
+
#  First sight of beam (by Comp Cal): https://logbooks.jlab.org/entry/3633247
+
# Swing and Overnight Running
+
#* 15 nA on Al V-wire ([https://logbooks.jlab.org/entry/3633248 full running condition]).
+
#* Lost beam around 2pm (due to radiation damaged valve position sensor).
+
# FCAL is down:
+
#* [https://logbooks.jlab.org/entry/3633312 Monitoring current draw on CAN bus] [Matt]
+
#* Rapid access is arrange between 10am - noon.
+
# Run Plan:
+
#* https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2018-v5.pdf
+
#* Beam requested today: 2nA on the foil.
+
# Cryo
+
#* solenoid helium fill test this morning: https://logbooks.jlab.org/entry/3633314
+