Run Planning Meeting Notes, Nov 29-Dec 6, 2018

From GlueXWiki
Revision as of 09:30, 30 November 2018 by Billlee (Talk | contribs) (Wednesday, Nov 28 at 8:45)

Jump to: navigation, search

Wednesday, Nov 28 at 8:45

  1. Cryo
    • solenoid helium fill test this morning
  2. Comp Cal installation
    • Completed at 6pm yesterday
  3. First sight of beam (by Comp Cal)
  4. Swing and Overnight Running
    • 15 nA on Al V-wire (full running condition).
    • Lost beam around 2pm (due to radiation damaged valve position sensor).
  5. FCAL is down:
    • Rapid access is arrange between 10am - noon.
  6. Run Plan: