Difference between revisions of "Run Planning Meeting Notes, Nov 8-Nov 14, 2018"

From GlueXWiki
Jump to: navigation, search
(Thursday, Nov 8 at 08:45)
(Thursday, Nov 8 at 08:45)
Line 18: Line 18:
 
#* PS and PSC coincidence scalers frozen, ps_client running on gluon100 restarted, instructions in hdops wiki
 
#* PS and PSC coincidence scalers frozen, ps_client running on gluon100 restarted, instructions in hdops wiki
 
#* beam position went awry, rates soared, reference module for IOC reading out 5C11B failed, replaced
 
#* beam position went awry, rates soared, reference module for IOC reading out 5C11B failed, replaced
 +
#* EPICS froze for 2h, started working without intervention
 
#Reports
 
#Reports
 
#*Monitoring
 
#*Monitoring
 
# Plans
 
# Plans
 
#Notes
 
#Notes

Revision as of 18:41, 7 November 2018

<- Back to Run Coordination Meetings:Fall2018 Run

Thursday, Nov 8 at 08:45

  1. Last 24h:
    • TAC run with empty target, v-wire at 50nA, reduced field in PS (400A), low E TAGH counters on
    • Beam tuning
    • Data taking with reduced PS field, coherent edge at 7GeV
  2. Issues
    • PS and PSC coincidence scalers frozen, ps_client running on gluon100 restarted, instructions in hdops wiki
    • beam position went awry, rates soared, reference module for IOC reading out 5C11B failed, replaced
    • EPICS froze for 2h, started working without intervention
  3. Reports
    • Monitoring
  4. Plans
  5. Notes