(Thursday, Nov 8 at 08:45)
(Thursday, Nov 8 at 08:45)
Line 14: Line 14:
 
#* TAC run with empty target, v-wire at 50nA, reduced field in PS (400A), low E TAGH counters on
 
#* TAC run with empty target, v-wire at 50nA, reduced field in PS (400A), low E TAGH counters on
 
#** [https://logbooks.jlab.org/entry/3622665 logbook entry with preliminary analysis]
 
#** [https://logbooks.jlab.org/entry/3622665 logbook entry with preliminary analysis]
 +
#* Harp Scan
 
#* Beam tuning (deferred)
 
#* Beam tuning (deferred)
 
#* Data taking with reduced PS field, coherent edge at 7GeV
 
#* Data taking with reduced PS field, coherent edge at 7GeV
 
#** [https://logbooks.jlab.org/entry/3622899 Rates]
 
#** [https://logbooks.jlab.org/entry/3622899 Rates]
 
#** Low energy running [https://docs.google.com/spreadsheets/d/1qJv80NKS1zCrBj5utogCAIBo5KZXtTocV0fc5pqfx_0/edit?usp=sharing Trigger Spreadsheet]
 
#** Low energy running [https://docs.google.com/spreadsheets/d/1qJv80NKS1zCrBj5utogCAIBo5KZXtTocV0fc5pqfx_0/edit?usp=sharing Trigger Spreadsheet]
 +
#** RF
 
#Issues
 
#Issues
 
#* PS and PSC coincidence scalers frozen, ps_client running on gluon100 restarted, instructions in hdops wiki
 
#* PS and PSC coincidence scalers frozen, ps_client running on gluon100 restarted, instructions in hdops wiki
 
#* beam position went awry, rates soared, reference module for IOC reading out 5C11B failed, replaced
 
#* beam position went awry, rates soared, reference module for IOC reading out 5C11B failed, replaced
#* EPICS froze for 2h, started working without intervention
+
#* EPICS froze for 2h, started working without intervention, now again unresponsive
 
#Reports
 
#Reports
 
#*Monitoring
 
#*Monitoring
 
# Plans
 
# Plans
 
#Notes
 
#Notes

Revision as of 09:37, 8 November 2018

<- Back to Run Coordination Meetings:Fall2018 Run

Thursday, Nov 8 at 08:45

  1. Last 24h:
  2. Issues
    • PS and PSC coincidence scalers frozen, ps_client running on gluon100 restarted, instructions in hdops wiki
    • beam position went awry, rates soared, reference module for IOC reading out 5C11B failed, replaced
    • EPICS froze for 2h, started working without intervention, now again unresponsive
  3. Reports
    • Monitoring
  4. Plans
  5. Notes