Difference between revisions of "Run Planning Meeting Notes, Nov 8-Nov 14, 2018"
From GlueXWiki
(→Thursday, Nov 8 at 08:45) |
(→Thursday, Nov 8 at 08:45) |
||
Line 19: | Line 19: | ||
#** [https://logbooks.jlab.org/entry/3622899 Rates] | #** [https://logbooks.jlab.org/entry/3622899 Rates] | ||
#** Low energy running [https://docs.google.com/spreadsheets/d/1qJv80NKS1zCrBj5utogCAIBo5KZXtTocV0fc5pqfx_0/edit?usp=sharing Trigger Spreadsheet] | #** Low energy running [https://docs.google.com/spreadsheets/d/1qJv80NKS1zCrBj5utogCAIBo5KZXtTocV0fc5pqfx_0/edit?usp=sharing Trigger Spreadsheet] | ||
− | #** RF | + | #** RF problems in the night |
#Issues | #Issues | ||
#* PS and PSC coincidence scalers frozen, ps_client running on gluon100 restarted, instructions in hdops wiki | #* PS and PSC coincidence scalers frozen, ps_client running on gluon100 restarted, instructions in hdops wiki |
Revision as of 09:37, 8 November 2018
<- Back to Run Coordination Meetings:Fall2018 Run
- Trigger graphs
- Trigger Spreadsheet
- Run Plan Google Calendar
- Accel. Plan Google Calendar
- Acc whiteboard
- Counting house whiteboard
- Hall D schedule for week 8
- Hall D schedule for week 9
Thursday, Nov 8 at 08:45
- Last 24h:
- TAC run with empty target, v-wire at 50nA, reduced field in PS (400A), low E TAGH counters on
- Harp Scan
- Beam tuning (deferred)
- Data taking with reduced PS field, coherent edge at 7GeV
- Rates
- Low energy running Trigger Spreadsheet
- RF problems in the night
- Issues
- PS and PSC coincidence scalers frozen, ps_client running on gluon100 restarted, instructions in hdops wiki
- beam position went awry, rates soared, reference module for IOC reading out 5C11B failed, replaced
- EPICS froze for 2h, started working without intervention, now again unresponsive
- Reports
- Monitoring
- Plans
- Notes