Difference between revisions of "Run Planning Meeting Notes, Nov 8-Nov 14, 2018"
From GlueXWiki
(→Thursday, Nov 8 at 08:45) |
(→Thursday, Nov 8 at 08:45) |
||
Line 24: | Line 24: | ||
#* beam position went awry, rates soared, reference module for IOC reading out 5C11B failed, replaced | #* beam position went awry, rates soared, reference module for IOC reading out 5C11B failed, replaced | ||
#* EPICS froze for 2h, started working without intervention, now again unresponsive | #* EPICS froze for 2h, started working without intervention, now again unresponsive | ||
− | #* [https://logbooks.jlab.org/entry/3622585 Target PTR turned off] | + | #* [https://logbooks.jlab.org/entry/3622585 Target PTR turned off], alarm ignored |
#Reports | #Reports | ||
#* [https://logbooks.jlab.org/entry/3622942 Monitoring] | #* [https://logbooks.jlab.org/entry/3622942 Monitoring] | ||
# Plans | # Plans | ||
#Notes | #Notes |
Revision as of 10:22, 8 November 2018
<- Back to Run Coordination Meetings:Fall2018 Run
- Trigger graphs
- Trigger Spreadsheet
- Run Plan Google Calendar
- Accel. Plan Google Calendar
- Acc whiteboard
- Counting house whiteboard
- Hall D schedule for week 8
- Hall D schedule for week 9
Thursday, Nov 8 at 08:45
- Last 24h:
- TAC run with empty target, v-wire at 50nA, reduced field in PS (400A), low E TAGH counters on
- Harp Scan
- Beam tuning (deferred)
- Data taking with reduced PS field, coherent edge at 7GeV
- TAGH Rates (Amo), (Diamond), Coincidence Rates
- Low energy running Trigger Spreadsheet
- RF problems in the night
- Issues
- PS and PSC coincidence scalers frozen, ps_client running on gluon100 restarted, instructions in hdops wiki
- beam position went awry, rates soared, reference module for IOC reading out 5C11B failed, replaced
- EPICS froze for 2h, started working without intervention, now again unresponsive
- Target PTR turned off, alarm ignored
- Reports
- Plans
- Notes