Difference between revisions of "Run Planning Meeting Notes, Nov 8-Nov 14, 2018"

From GlueXWiki
Jump to: navigation, search
(Friday, Nov 9 at 08:45)
(Friday, Nov 9 at 08:45)
Line 26: Line 26:
 
#*[https://logbooks.jlab.org/entry/3623383 Rates]
 
#*[https://logbooks.jlab.org/entry/3623383 Rates]
 
#*[https://logbooks.jlab.org/entry/3623404 Monitoring report]
 
#*[https://logbooks.jlab.org/entry/3623404 Monitoring report]
 +
#*[https://logbooks.jlab.org/entry/3623250 PS energy range]
 
#Plans
 
#Plans
 
#* Beam Studies and System Recovery switched
 
#* Beam Studies and System Recovery switched

Revision as of 10:13, 9 November 2018

<- Back to Run Coordination Meetings:Fall2018 Run


Friday, Nov 9 at 08:45

  1. Last 24h:
    • >80% beam available, >95% used
    • completed 2nd cycle
    • harp scan ongoing
  2. Issues
  3. Reports
  4. Plans
    • Beam Studies and System Recovery switched
    • System Recovery (Monday 08:30): investigate water leak in tunnel, ~3h
    • Beam Studies (Tuesday): high current test, halls A, B and C have to stayed locked, D optional
  5. Notes

Thursday, Nov 8 at 08:45

  1. Last 24h:
  2. Issues
    • PS and PSC coincidence scalers frozen, ps_client running on gluon100 restarted, instructions in hdops wiki
    • beam position went awry, rates soared, reference module for IOC reading out 5C11B failed, replaced
    • EPICS froze for 2h, started working without intervention, now again unresponsive
    • Target PTR turned off, do not ignore any alarms!
  3. Reports
  4. Plans
  5. Notes