(Monday, Nov 12 at 08:45)
(Monday, Nov 12 at 08:45)
Line 19: Line 19:
 
#* 6h down time on Friday due to HV issue on RF cavity 1L23
 
#* 6h down time on Friday due to HV issue on RF cavity 1L23
 
#* 12h down on Saturday due to 1L23 and more
 
#* 12h down on Saturday due to 1L23 and more
#* xh down on Sunday
+
#* 4h down on Sunday
 
#* Completed the goal of 5 full cycles (2B events) on Sunday ~5pm
 
#* Completed the goal of 5 full cycles (2B events) on Sunday ~5pm
 
#Issues
 
#Issues
Line 25: Line 25:
 
#Reports
 
#Reports
 
#* [https://logbooks.jlab.org/entry/3624353 Friday morning harp scan] fitted with [https://logbooks.jlab.org/entry/3624320 new online tool (Richard)]
 
#* [https://logbooks.jlab.org/entry/3624353 Friday morning harp scan] fitted with [https://logbooks.jlab.org/entry/3624320 new online tool (Richard)]
 +
#* [https://logbooks.jlab.org/entry/3623477 Transmission check]
 
#* [https://logbooks.jlab.org/entry/3624456 Sunday morning harp scan]
 
#* [https://logbooks.jlab.org/entry/3624456 Sunday morning harp scan]
 
#* [https://logbooks.jlab.org/entry/3624871 Monitoring (Thomas)]
 
#* [https://logbooks.jlab.org/entry/3624871 Monitoring (Thomas)]

Revision as of 09:44, 12 November 2018

<- Back to Run Coordination Meetings:Fall2018 Run


Monday, Nov 12 at 08:45

  1. Last 72h:
    • 6h down time on Friday due to HV issue on RF cavity 1L23
    • 12h down on Saturday due to 1L23 and more
    • 4h down on Sunday
    • Completed the goal of 5 full cycles (2B events) on Sunday ~5pm
  2. Issues
  3. Reports
  4. Plans
    • System Recovery (Monday 07:30, 6h+): switching back to 8.8GeV running?
    • Beam Studies (Tuesday 08:30, 8h): installation of beam pipe
  5. Notes

Friday, Nov 9 at 08:45

  1. Last 24h:
    • >80% beam available, >95% used
    • completed 2nd cycle
    • harp scan ongoing
  2. Issues
  3. Reports
  4. Plans
    • Beam Studies and System Recovery switched
    • System Recovery (Monday 08:30): investigate water leak in tunnel, ~3h
    • Beam Studies (Tuesday): high current test, halls A, B and C have to stayed locked, D optional
  5. Notes

Thursday, Nov 8 at 08:45

  1. Last 24h:
  2. Issues
    • PS and PSC coincidence scalers frozen, ps_client running on gluon100 restarted, instructions in hdops wiki
    • beam position went awry, rates soared, reference module for IOC reading out 5C11B failed, replaced
    • EPICS froze for 2h, started working without intervention, now again unresponsive
    • Target PTR turned off, do not ignore any alarms!
  3. Reports
  4. Plans
  5. Notes