Difference between revisions of "Run Planning Meeting Notes, Nov 8-Nov 14, 2018"

From GlueXWiki
Jump to: navigation, search
(Tuesday, Nov 13 at 08:45)
Line 13: Line 13:
 
*[https://halldweb.jlab.org/wiki/index.php/File:Fall18_week8.jpg Hall D schedule for week 8]
 
*[https://halldweb.jlab.org/wiki/index.php/File:Fall18_week8.jpg Hall D schedule for week 8]
 
*[https://halldweb.jlab.org/wiki/index.php/File:Fall18_week9.jpg Hall D schedule for week 9]
 
*[https://halldweb.jlab.org/wiki/index.php/File:Fall18_week9.jpg Hall D schedule for week 9]
 +
 +
 +
== Wednesday, Nov 14 at 08:45 ==
 +
 +
#Last 24h:
 +
#* Installation of beam pipe
 +
#* Harp scan
 +
#* Switch back to standard production running:
 +
#** Ramp up PS magnet to 910A (done)
 +
#** Low-energy tagger counters off (done)
 +
#** Set coherent peak at 8.8GeV ('''not done''')
 +
#Issues
 +
#Reports
 +
#* Monitoring (Thomas)
 +
#Plans
 +
#* Production running
 +
#Notes
  
 
== Tuesday, Nov 13 at 08:45 ==
 
== Tuesday, Nov 13 at 08:45 ==

Revision as of 15:51, 13 November 2018

<- Back to Run Coordination Meetings:Fall2018 Run



Wednesday, Nov 14 at 08:45

  1. Last 24h:
    • Installation of beam pipe
    • Harp scan
    • Switch back to standard production running:
      • Ramp up PS magnet to 910A (done)
      • Low-energy tagger counters off (done)
      • Set coherent peak at 8.8GeV (not done)
  2. Issues
  3. Reports
    • Monitoring (Thomas)
  4. Plans
    • Production running
  5. Notes

Tuesday, Nov 13 at 08:45

  1. Last 24h:
    • 6h+ scheduled down time due to system recovery, but many problems
    • Preparations for beam pipe installation (done)
    • Upgrade to Hall D current locks + beam based test (30min)
    • Only very little beam during the night, accelerator harp scan done [1][2], ours interrupted
    • Switch back to standard production running:
      • Ramp up PS magnet to 910A (done)
      • Low-energy tagger counters off (done)
      • Set coherent peak at 8.8GeV (not done)
  2. Issues
  3. Reports
  4. Plans
    • Beam Studies (Tuesday 08:30, 8h): installation of beam pipe
    • French delegation to visit ComCal (6 people)
    • Harp scan
    • Production running
  5. Notes

Monday, Nov 12 at 08:45

  1. Last 72h:
    • 6h down time on Friday due to HV issue on RF cavity 1L23
    • 12h down on Saturday due to 1L23 and more
    • 4h down on Sunday
    • Completed the goal of 5 full cycles (2B events) on Sunday ~5pm
  2. Issues
  3. Reports
  4. Plans
    • System Recovery (Monday 07:30, 6h+): switching back to 8.8GeV running?
    • Beam Studies (Tuesday 08:30, 8h): installation of beam pipe
  5. Notes

Friday, Nov 9 at 08:45

  1. Last 24h:
    • >80% beam available, >95% used
    • completed 2nd cycle
    • harp scan ongoing
  2. Issues
  3. Reports
  4. Plans
    • Beam Studies and System Recovery switched
    • System Recovery (Monday 08:30): investigate water leak in tunnel, ~3h
    • Beam Studies (Tuesday): high current test, halls A, B and C have to stayed locked, D optional
  5. Notes

Thursday, Nov 8 at 08:45

  1. Last 24h:
  2. Issues
    • PS and PSC coincidence scalers frozen, ps_client running on gluon100 restarted, instructions in hdops wiki
    • beam position went awry, rates soared, reference module for IOC reading out 5C11B failed, replaced
    • EPICS froze for 2h, started working without intervention, now again unresponsive
    • Target PTR turned off, do not ignore any alarms!
  3. Reports
  4. Plans
  5. Notes