Difference between revisions of "Run Planning Meeting Notes, November 11 - November 17, 2021"

From GlueXWiki
Jump to: navigation, search
(Created page with "=Thursday November 11= #Last 24h: #* Down till 3:30pm: #** 10 FCAL bases replaced [https://logbooks.jlab.org/entry/3939921] #** CDC/FDC? gas mix alarm [https://logbooks.jlab.o...")
 
(Thursday November 11)
Line 10: Line 10:
 
#* bad f250 in TAGH [https://logbooks.jlab.org/entry/3940210]
 
#* bad f250 in TAGH [https://logbooks.jlab.org/entry/3940210]
 
# [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:]  
 
# [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:]  
#* Continue production at 150nA on diamond w/o AMO?
+
#* Continue production at 150nA on diamond w/o AMO (next AMO run Nov 14)
#* When to nudge the coherent peak - when changing 0/90 to 45/125 but not PERP to PARA
+
#* nudge the coherent peak every time when changing 0/90 to 45/125 and PERP to PARA  
 
#* Expect 1+ hours down when Hall A changes to 4 passes - not clear when
 
#* Expect 1+ hours down when Hall A changes to 4 passes - not clear when

Revision as of 10:35, 11 November 2021

Thursday November 11

  1. Last 24h:
    • Down till 3:30pm:
      • 10 FCAL bases replaced [1]
      • CDC/FDC? gas mix alarm [2]
    • Harp scan [3]
    • Recorded 800M+ events with diamond/amo (LHe4 target)
    • lock on AC disabled this morning [4]
  2. Issues:
    • bad f250 in TAGH [5]
  3. Plan:
    • Continue production at 150nA on diamond w/o AMO (next AMO run Nov 14)
    • nudge the coherent peak every time when changing 0/90 to 45/125 and PERP to PARA
    • Expect 1+ hours down when Hall A changes to 4 passes - not clear when