=Monday November 15=
 +
#Last 72h:
 +
#* recorded 5.6B+ triggers on diamond and 140M on AMO (starting 17:30 on Friday)
 +
#* after the [https://logbooks.jlab.org/entry/3941683 colimator scan] (Fri 13:30-16:30) restored old quad settings (10% transmission increase).
 +
#* writing on tape stopped Saturday morning (disks can take up to 3 days running)
 +
#* higher than normal trip rate Saturday/Sunday
 +
#Issues:
 +
#* writing on tape
 +
# [https://halldweb.jlab.org/wiki/index.php/SRC/CT_Run_Plan Plan:]
 +
#* expect no/bad beam day shift (RF working on cavities)
 +
#* BCM calibration for Hall C energy measurements 14:30-15:30
 +
#* Continue production at 150nA on diamond
 +
#* plan for target changes
 +
# Analysis update
 +
 
=Friday November 12=
 
=Friday November 12=
 
#Last 24h:
 
#Last 24h:

Revision as of 23:51, 14 November 2021

Monday November 15

  1. Last 72h:
    • recorded 5.6B+ triggers on diamond and 140M on AMO (starting 17:30 on Friday)
    • after the colimator scan (Fri 13:30-16:30) restored old quad settings (10% transmission increase).
    • writing on tape stopped Saturday morning (disks can take up to 3 days running)
    • higher than normal trip rate Saturday/Sunday
  2. Issues:
    • writing on tape
  3. Plan:
    • expect no/bad beam day shift (RF working on cavities)
    • BCM calibration for Hall C energy measurements 14:30-15:30
    • Continue production at 150nA on diamond
    • plan for target changes
  4. Analysis update

Friday November 12

  1. Last 24h:
    • recorded 2.2B triggers on diamond
    • improved convergence: before and after
    • ... but the transmission went down by ~15% [1], [2]
    • ccdb for 9000+ runs [3]
    • TAGH timing offset changed [4]
    • restoring communications with FCAL bases [5]
  2. Issues:
    • bad f250 in TAGH [6] - no longer an issue (Sasha power-cycled the crate)
    • transmission - Hovanes will do AC scan when the beam is back after 10am - profiler doesn't lock has to be fixed at that time, as well
  3. Plan:
    • Down starting at 10am: for 1+ hours (Hall A changes to 4 passes) - FCAL items will be surveyed
    • Continue production at 150nA on diamond
  4. Analysis update

Thursday November 11

  1. Last 24h:
    • Down till 3:30pm:
      • 10 FCAL bases replaced [7]
      • CDC/FDC? gas mix alarm [8]
    • Harp scan [9]
    • Recorded 800M+ events with diamond/amo (LHe4 target)
    • lock on AC disabled this morning [10]
  2. Issues:
    • bad f250 in TAGH [11]
  3. Plan:
    • Continue production at 150nA on diamond w/o AMO (next AMO run Nov 14)
    • nudge the coherent peak every time when changing 0/90 to 45/125 and PERP to PARA
    • Expect 1+ hours down when Hall A changes to 4 passes - not clear when