=Friday, November 19= | =Friday, November 19= | ||
#Last 24h: | #Last 24h: | ||
− | * XXX B triggers: [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2021-11/index.html] | + | #* XXX B triggers: [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2021-11/index.html] |
#Issues: | #Issues: | ||
Line 8: | Line 8: | ||
#* Continue production at 150nA on diamond | #* Continue production at 150nA on diamond | ||
# Analysis update | # Analysis update | ||
− | |||
=Thursday November 18= | =Thursday November 18= |
Revision as of 20:31, 18 November 2021
Friday, November 19
- Last 24h:
- XXX B triggers: [1]
- Issues:
- Plan:
- Continue production at 150nA on diamond
- Analysis update
Thursday November 18
- Last 24h:
- ~1.4 B triggers (250M AMO): [2]
- Down from ~8:45 am -> 9:30 pm due to 4th pass RF separator problem
- Repair plan: down at ~10 am for ~30 minutes, then acc will decide if full system needs to be down for repair for longer time
- Some discussion regarding using magnetic separation for 1 hall running if down more than 30 minutes
- Issues:
- writing on tape?
- High temperature of locked-up FCAL bases? [3]
- Shift crew will take over servicing FCAL base lock ups. wiki instructions
- Plan:
- Continue production at 150nA on diamond
- Analysis update