Difference between revisions of "Run Planning Meeting Notes, November 18 - November 24, 2021"

From GlueXWiki
Jump to: navigation, search
(Thursday November 18)
Line 4: Line 4:
 
#Issues:
 
#Issues:
 
#* writing on tape?
 
#* writing on tape?
 +
#* High temperature of locked-up bases? [https://logbooks.jlab.org/entry/3945260]
 
#* Shift crew will take over servicing FCAL base lock ups. [https://halldweb.jlab.org/hdops/wiki/index.php/Forward_Calorimeter_Shift#FCAL_Base_lockup wiki instructions]
 
#* Shift crew will take over servicing FCAL base lock ups. [https://halldweb.jlab.org/hdops/wiki/index.php/Forward_Calorimeter_Shift#FCAL_Base_lockup wiki instructions]
 
# [https://halldweb.jlab.org/wiki/index.php/SRC/CT_Run_Plan Plan:]  
 
# [https://halldweb.jlab.org/wiki/index.php/SRC/CT_Run_Plan Plan:]  
 
#* Continue production at 150nA on diamond
 
#* Continue production at 150nA on diamond
 
# Analysis update
 
# Analysis update

Revision as of 22:54, 17 November 2021

Thursday November 18

  1. Last 24h:
    • Down from ~8:45 am -> 9:30 pm due to 4th pass RF separator problem
  2. Issues:
    • writing on tape?
    • High temperature of locked-up bases? [1]
    • Shift crew will take over servicing FCAL base lock ups. wiki instructions
  3. Plan:
    • Continue production at 150nA on diamond
  4. Analysis update