m |
(→Thursday November 18) |
||
Line 3: | Line 3: | ||
#* ~1.4 B triggers (250M AMO): [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2021-11/index.html] | #* ~1.4 B triggers (250M AMO): [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2021-11/index.html] | ||
#* Down from ~8:45 am -> 9:30 pm due to 4th pass RF separator problem | #* Down from ~8:45 am -> 9:30 pm due to 4th pass RF separator problem | ||
+ | #** Repair plan: down at ~10 am for ~30 minutes, then acc will decide if full system needs to be down for repair | ||
+ | #** Some discussion regarding using magnetic separation for 1 hall running if down more than 30 minutes | ||
#Issues: | #Issues: | ||
#* writing on tape? | #* writing on tape? |
Revision as of 09:33, 18 November 2021
Thursday November 18
- Last 24h:
- ~1.4 B triggers (250M AMO): [1]
- Down from ~8:45 am -> 9:30 pm due to 4th pass RF separator problem
- Repair plan: down at ~10 am for ~30 minutes, then acc will decide if full system needs to be down for repair
- Some discussion regarding using magnetic separation for 1 hall running if down more than 30 minutes
- Issues:
- writing on tape?
- High temperature of locked-up FCAL bases? [2]
- Shift crew will take over servicing FCAL base lock ups. wiki instructions
- Plan:
- Continue production at 150nA on diamond
- Analysis update