(Thursday November 18)
Line 1: Line 1:
 +
=Friday, November 19=
 +
#Last 24h:
 +
* XXX B triggers: [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2021-11/index.html]
 +
 +
#Issues:
 +
 +
# [https://halldweb.jlab.org/wiki/index.php/SRC/CT_Run_Plan Plan:]
 +
#* Continue production at 150nA on diamond
 +
# Analysis update
 +
 +
 
=Thursday November 18=
 
=Thursday November 18=
 
#Last 24h:
 
#Last 24h:

Revision as of 20:31, 18 November 2021

Friday, November 19

  1. Last 24h:
  • XXX B triggers: [1]
  1. Issues:
  1. Plan:
    • Continue production at 150nA on diamond
  2. Analysis update


Thursday November 18

  1. Last 24h:
    • ~1.4 B triggers (250M AMO): [2]
    • Down from ~8:45 am -> 9:30 pm due to 4th pass RF separator problem
      • Repair plan: down at ~10 am for ~30 minutes, then acc will decide if full system needs to be down for repair for longer time
      • Some discussion regarding using magnetic separation for 1 hall running if down more than 30 minutes
  2. Issues:
    • writing on tape?
    • High temperature of locked-up FCAL bases? [3]
    • Shift crew will take over servicing FCAL base lock ups. wiki instructions
  3. Plan:
    • Continue production at 150nA on diamond
  4. Analysis update