Difference between revisions of "Run Planning Meeting Notes, November 18 - November 24, 2021"

From GlueXWiki
Jump to: navigation, search
m (Friday, November 19)
Line 1: Line 1:
 
=Friday, November 19=
 
=Friday, November 19=
 
#Last 24h:
 
#Last 24h:
* XXX B triggers: [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2021-11/index.html]
+
#* XXX B triggers: [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2021-11/index.html]
  
 
#Issues:
 
#Issues:
Line 8: Line 8:
 
#* Continue production at 150nA on diamond
 
#* Continue production at 150nA on diamond
 
# Analysis update
 
# Analysis update
 
  
 
=Thursday November 18=
 
=Thursday November 18=

Revision as of 20:31, 18 November 2021

Friday, November 19

  1. Last 24h:
    • XXX B triggers: [1]
  1. Issues:
  1. Plan:
    • Continue production at 150nA on diamond
  2. Analysis update

Thursday November 18

  1. Last 24h:
    • ~1.4 B triggers (250M AMO): [2]
    • Down from ~8:45 am -> 9:30 pm due to 4th pass RF separator problem
      • Repair plan: down at ~10 am for ~30 minutes, then acc will decide if full system needs to be down for repair for longer time
      • Some discussion regarding using magnetic separation for 1 hall running if down more than 30 minutes
  2. Issues:
    • writing on tape?
    • High temperature of locked-up FCAL bases? [3]
    • Shift crew will take over servicing FCAL base lock ups. wiki instructions
  3. Plan:
    • Continue production at 150nA on diamond
  4. Analysis update