#Issues:
 
#Issues:
 
+
#* A couple of minor issues:
 +
#** DAQ computer acting weird, but this did not impact actual data taking
 +
#** Alcohol bubbler too dark to see: [https://logbooks.jlab.org/entry/3946251]
 
# [https://halldweb.jlab.org/wiki/index.php/SRC/CT_Run_Plan Plan:]  
 
# [https://halldweb.jlab.org/wiki/index.php/SRC/CT_Run_Plan Plan:]  
 
#* Continue production at 150nA on diamond
 
#* Continue production at 150nA on diamond
 +
#* Saturday day:  Low current + empty target?
 +
#* Saturday swing:  switch to liquid deuterium
 
# Analysis update
 
# Analysis update
  

Revision as of 07:53, 19 November 2021

Friday, November 19

  1. Last 24h:
    • XXX B triggers: [1]
  1. Issues:
    • A couple of minor issues:
      • DAQ computer acting weird, but this did not impact actual data taking
      • Alcohol bubbler too dark to see: [2]
  2. Plan:
    • Continue production at 150nA on diamond
    • Saturday day: Low current + empty target?
    • Saturday swing: switch to liquid deuterium
  3. Analysis update

Thursday November 18

  1. Last 24h:
    • ~1.4 B triggers (250M AMO): [3]
    • Down from ~8:45 am -> 9:30 pm due to 4th pass RF separator problem
      • Repair plan: down at ~10 am for ~30 minutes, then acc will decide if full system needs to be down for repair for longer time
      • Some discussion regarding using magnetic separation for 1 hall running if down more than 30 minutes
  2. Issues:
    • writing on tape?
    • High temperature of locked-up FCAL bases? [4]
    • Shift crew will take over servicing FCAL base lock ups. wiki instructions
  3. Plan:
    • Continue production at 150nA on diamond
  4. Analysis update