=Tuesday, November 23=
 +
#Last 24h:
 +
 +
#Issues:
 +
#* Solenoid dump at 11:30 am
 +
#** Traced to defective Convectron panel meter [https://logbooks.jlab.org/entry/3948244]
 +
#** Started ramp back up at 14:33
 +
#Plan:
 +
#* Continue production at 140 nA on diamond
 +
# Analysis update
 +
 +
 
=Monday, November 22=
 
=Monday, November 22=
 
#Last 72h:
 
#Last 72h:

Revision as of 22:47, 22 November 2021

Tuesday, November 23

  1. Last 24h:
  1. Issues:
    • Solenoid dump at 11:30 am
      • Traced to defective Convectron panel meter [1]
      • Started ramp back up at 14:33
  2. Plan:
    • Continue production at 140 nA on diamond
  3. Analysis update


Monday, November 22

  1. Last 72h:
  2. Issues:
  3. Plan:
    • Continue production at 140 nA on diamond
  4. Analysis update

Friday, November 19

  1. Last 24h:
    • Repair work for RF separator did not end up impacting taking beam -- yay!
    • Added ~2B triggers: [3]
  2. Issues:
    • A couple of minor issues:
      • DAQ computer acting weird, but this did not impact actual data taking
      • Alcohol bubbler too dark to see: [4]
  3. Plan:
    • Continue production at 150nA on diamond
    • Saturday day: Low current + empty target?
    • Saturday swing: switch to liquid deuterium
  4. Analysis update

Thursday November 18

  1. Last 24h:
    • ~1.4 B triggers (250M AMO): [5]
    • Down from ~8:45 am -> 9:30 pm due to 4th pass RF separator problem
      • Repair plan: down at ~10 am for ~30 minutes, then acc will decide if full system needs to be down for repair for longer time
      • Some discussion regarding using magnetic separation for 1 hall running if down more than 30 minutes
  2. Issues:
    • writing on tape?
    • High temperature of locked-up FCAL bases? [6]
    • Shift crew will take over servicing FCAL base lock ups. wiki instructions
  3. Plan:
    • Continue production at 150nA on diamond