=Tuesday, November 23=
 
=Tuesday, November 23=
 
#Last 24h:
 
#Last 24h:
#* Took ~4.5B triggers on LD2
+
#* Took ~4.5B triggers on LD2 before solenoid dump
 
#* Took some PS background data with TPOL converter retracted while solenoid was ramping
 
#* Took some PS background data with TPOL converter retracted while solenoid was ramping
 
#Issues:
 
#Issues:

Revision as of 23:49, 22 November 2021

Tuesday, November 23

  1. Last 24h:
    • Took ~4.5B triggers on LD2 before solenoid dump
    • Took some PS background data with TPOL converter retracted while solenoid was ramping
  2. Issues:
    • Solenoid dump at 11:30 am
      • Traced to defective Convectron panel meter [1]
      • Started ramp back up at 14:33
  3. Plan:
    • Continue production at 140 nA on diamond
  4. Analysis update

Monday, November 22

  1. Last 72h:
  2. Issues:
  3. Plan:
    • Continue production at 140 nA on diamond
  4. Analysis update

Friday, November 19

  1. Last 24h:
    • Repair work for RF separator did not end up impacting taking beam -- yay!
    • Added ~2B triggers: [3]
  2. Issues:
    • A couple of minor issues:
      • DAQ computer acting weird, but this did not impact actual data taking
      • Alcohol bubbler too dark to see: [4]
  3. Plan:
    • Continue production at 150nA on diamond
    • Saturday day: Low current + empty target?
    • Saturday swing: switch to liquid deuterium
  4. Analysis update

Thursday November 18

  1. Last 24h:
    • ~1.4 B triggers (250M AMO): [5]
    • Down from ~8:45 am -> 9:30 pm due to 4th pass RF separator problem
      • Repair plan: down at ~10 am for ~30 minutes, then acc will decide if full system needs to be down for repair for longer time
      • Some discussion regarding using magnetic separation for 1 hall running if down more than 30 minutes
  2. Issues:
    • writing on tape?
    • High temperature of locked-up FCAL bases? [6]
    • Shift crew will take over servicing FCAL base lock ups. wiki instructions
  3. Plan:
    • Continue production at 150nA on diamond
  4. Analysis update