Difference between revisions of "Run Planning Meeting Notes, November 30 - December 7, 2022"

From GlueXWiki
Jump to: navigation, search
(Created page with "Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394) [https://cebaf.j...")
 
(Thursday Dec. 1st)
Line 22: Line 22:
 
=== Run plan ===
 
=== Run plan ===
 
* 20 min test at low beam current/high Active Colim. gain to see if adjustment are needed (A. Somov)
 
* 20 min test at low beam current/high Active Colim. gain to see if adjustment are needed (A. Somov)
* Last harp scan was done on Nov. 21st. Should we do a new one? (Transmission is fine.)  
+
* Last harp scan was done on Nov. 21st. Should we do a new one? ([https://logbooks.jlab.org/entry/4093519 Transmission is fine.])  
 
* Luminosity study
 
* Luminosity study

Revision as of 08:10, 1 December 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022


Thursday Dec. 1st

Last 24h

Reports

  • PrimEx Analysis progress (Drew)

Issues

  • The new FDC fadc is worst than the one replaced (Naomi/Lubomir).

Run plan

  • 20 min test at low beam current/high Active Colim. gain to see if adjustment are needed (A. Somov)
  • Last harp scan was done on Nov. 21st. Should we do a new one? (Transmission is fine.)
  • Luminosity study