Difference between revisions of "Run Planning Meeting Notes, November 30 - December 7, 2022"
From GlueXWiki
(Created page with "Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394) [https://cebaf.j...") |
(→Thursday Dec. 1st) |
||
Line 22: | Line 22: | ||
=== Run plan === | === Run plan === | ||
* 20 min test at low beam current/high Active Colim. gain to see if adjustment are needed (A. Somov) | * 20 min test at low beam current/high Active Colim. gain to see if adjustment are needed (A. Somov) | ||
− | * Last harp scan was done on Nov. 21st. Should we do a new one? (Transmission is fine.) | + | * Last harp scan was done on Nov. 21st. Should we do a new one? ([https://logbooks.jlab.org/entry/4093519 Transmission is fine.]) |
* Luminosity study | * Luminosity study |
Revision as of 08:10, 1 December 2022
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Back to Run Coordination Meetings:Fall2022
Thursday Dec. 1st
Last 24h
- Filled the target, from 10am-1pm. It took 3h to fill, and the first production runs are done while it was still filling.
Reports
- PrimEx Analysis progress (Drew)
Issues
- The new FDC fadc is worst than the one replaced (Naomi/Lubomir).
Run plan
- 20 min test at low beam current/high Active Colim. gain to see if adjustment are needed (A. Somov)
- Last harp scan was done on Nov. 21st. Should we do a new one? (Transmission is fine.)
- Luminosity study