Difference between revisions of "Run Planning Meeting Notes, November 30 - December 7, 2022"
From GlueXWiki
(→Thursday Dec. 1st) |
(→Thursday Dec. 1st) |
||
Line 12: | Line 12: | ||
= Thursday Dec. 1st = | = Thursday Dec. 1st = | ||
=== Last 24h === | === Last 24h === | ||
+ | *Wednesday started with production on Empty target. | ||
+ | *9:10am-11:30 Rapid access to change fadc for [https://logbooks.jlab.org/entry/4093177 FCal] and [https://logbooks.jlab.org/entry/4093179 FDC], and fill the target. | ||
* [https://logbooks.jlab.org/entry/4093185 Filled the target, from 10am-1pm]. It took 3h to fill, and [https://logbooks.jlab.org/entry/4093220 the first production runs are done while it was still filling]. | * [https://logbooks.jlab.org/entry/4093185 Filled the target, from 10am-1pm]. It took 3h to fill, and [https://logbooks.jlab.org/entry/4093220 the first production runs are done while it was still filling]. | ||
Line 18: | Line 20: | ||
=== Issues === | === Issues === | ||
− | *The new FDC fadc is worst than the one replaced (Naomi/Lubomir). | + | *The new FDC fadc is worst than the one replaced (Naomi/Lubomir). The problem is only for raw mode run. |
+ | *Many cdc p_diff alarms (e.g. 0.8 alarm/hour during swing and owl shifts) leading to runs often shorter than 2h (this has already been discussed several time. This is just a report). | ||
=== Run plan === | === Run plan === |
Revision as of 08:44, 1 December 2022
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Back to Run Coordination Meetings:Fall2022
Thursday Dec. 1st
Last 24h
- Wednesday started with production on Empty target.
- 9:10am-11:30 Rapid access to change fadc for FCal and FDC, and fill the target.
- Filled the target, from 10am-1pm. It took 3h to fill, and the first production runs are done while it was still filling.
Reports
- PrimEx Analysis progress (Drew)
Issues
- The new FDC fadc is worst than the one replaced (Naomi/Lubomir). The problem is only for raw mode run.
- Many cdc p_diff alarms (e.g. 0.8 alarm/hour during swing and owl shifts) leading to runs often shorter than 2h (this has already been discussed several time. This is just a report).
Run plan
- 20 min test at low beam current/high Active Colim. gain to see if adjustment are needed (A. Somov)
- Last harp scan was done on Nov. 21st. Should we do a new one? (Transmission is fine.)
- Luminosity study