*Wednesday started with production on Empty target.
 
*Wednesday started with production on Empty target.
 
*9:10am-11:30 Rapid access to change fadc for [https://logbooks.jlab.org/entry/4093177 FCal] and [https://logbooks.jlab.org/entry/4093179 FDC], and fill the target.
 
*9:10am-11:30 Rapid access to change fadc for [https://logbooks.jlab.org/entry/4093177 FCal] and [https://logbooks.jlab.org/entry/4093179 FDC], and fill the target.
* [https://logbooks.jlab.org/entry/4093185 Filled the target, from 10am-1pm]. It took 3h to fill, and [https://logbooks.jlab.org/entry/4093220 the first production runs are done while it was still filling].
+
*[https://logbooks.jlab.org/entry/4093185 Filled the target, from 10am-1pm]. It took 3h to fill, and [https://logbooks.jlab.org/entry/4093220 the first production runs are done while it was still filling].
 +
*Hall A re-started running at 17:48. A consequence is that the Hall D beam energy was quite instable from 6pm (Wed.) to 1am (Thursd.), with total drift of about 14 MeV.
  
 
=== Reports ===
 
=== Reports ===
Line 24: Line 25:
  
 
=== Run plan ===
 
=== Run plan ===
* 20 min test at low beam current/high Active Colim. gain to see if adjustment are needed (A. Somov)
+
*Hall C is expected to be back to running during swing shift today.
* Last harp scan was done on Nov. 21st. Should we do a new one? ([https://logbooks.jlab.org/entry/4093519 Transmission is fine.])  
+
*20 min test at low beam current/high Active Colim. gain to see if adjustment are needed (A. Somov)?
* Luminosity study
+
*Last harp scan was done on Nov. 21st. Should we do a new one? ([https://logbooks.jlab.org/entry/4093519 Transmission is fine.])  
 +
*Luminosity study?

Revision as of 08:56, 1 December 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022


Thursday Dec. 1st

Last 24h

Reports

  • PrimEx Analysis progress (Drew)

Issues

  • The new FDC fadc is worst than the one replaced (Naomi/Lubomir). The problem is only for raw mode run.
  • Many cdc p_diff alarms (e.g. 0.8 alarm/hour during swing and owl shifts) leading to runs often shorter than 2h (this has already been discussed several time. This is just a report).

Run plan

  • Hall C is expected to be back to running during swing shift today.
  • 20 min test at low beam current/high Active Colim. gain to see if adjustment are needed (A. Somov)?
  • Last harp scan was done on Nov. 21st. Should we do a new one? (Transmission is fine.)
  • Luminosity study?