Difference between revisions of "Run Planning Meeting Notes, November 30 - December 7, 2022"

From GlueXWiki
Jump to: navigation, search
(Thursday Dec. 1st)
(Last 24h)
Line 12: Line 12:
 
= Thursday Dec. 1st =
 
= Thursday Dec. 1st =
 
=== Last 24h ===
 
=== Last 24h ===
*Wednesday started with production on Empty target.
+
*Wednesday started with production on empty target.
 
*9:10am-11:30 Rapid access to change fadc for [https://logbooks.jlab.org/entry/4093177 FCal] and [https://logbooks.jlab.org/entry/4093179 FDC], and fill the target.
 
*9:10am-11:30 Rapid access to change fadc for [https://logbooks.jlab.org/entry/4093177 FCal] and [https://logbooks.jlab.org/entry/4093179 FDC], and fill the target.
 
*[https://logbooks.jlab.org/entry/4093185 Filled the target, from 10am-1pm]. It took 3h to fill, and [https://logbooks.jlab.org/entry/4093220 the first production runs are done while it was still filling].
 
*[https://logbooks.jlab.org/entry/4093185 Filled the target, from 10am-1pm]. It took 3h to fill, and [https://logbooks.jlab.org/entry/4093220 the first production runs are done while it was still filling].

Revision as of 09:09, 1 December 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022


Thursday Dec. 1st

Last 24h

Reports

  • PrimEx Analysis progress (Drew)

Issues

  • The new FDC fadc is worst than the one replaced (Naomi/Lubomir). The problem is only for raw mode run.
  • Many cdc p_diff alarms (e.g. 0.8 alarm/hour during swing and owl shifts) leading to runs often shorter than 2h (this has already been discussed several time. This is just a report).

Run plan

  • Hall C is expected to be back to running during swing shift today.
  • 20 min test at low beam current/high Active Colim. gain to see if adjustment are needed (A. Somov)?
  • Last harp scan was done on Nov. 21st. Should we do a new one? (Transmission is fine.)
  • Luminosity study?