= Tuesday Dec. 6th =
 +
=== Last 24h ===
 +
*Monday was spent with production on full target until ***.  *** of ABU (7am - 7am).
 +
*
 +
=== Reports ===
 +
*Update on electronic support? (Eugene)
 +
 +
=== Issues ===
 +
*
 +
 +
=== Short term run plan ===
 +
*Work Wednesday during RF recovery (from 8am to 4pm):
 +
**Hall (Control Access should be sufficient):
 +
***DIRC work.
 +
***Mark Dalton, to change one of the BCal fadc.
 +
***A. Somov, Vlad, Lubomir, Sergei and Arshak: work in the PS test area.
 +
**Tagger:
 +
 +
=== Tentative longer term run plan ===
 +
*8h of RF recovery Wednesday Dec. 7th, from 8am to 4pm.
 +
*TAC run?
 +
*Luminosity study?
 +
*Fall 2022 run period ends on Dec. 19th, 7am.
 +
  
 
= Monday Dec. 5th =
 
= Monday Dec. 5th =

Revision as of 15:23, 5 December 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Tuesday Dec. 6th

Last 24h

  • Monday was spent with production on full target until ***. *** of ABU (7am - 7am).

Reports

  • Update on electronic support? (Eugene)

Issues

Short term run plan

  • Work Wednesday during RF recovery (from 8am to 4pm):
    • Hall (Control Access should be sufficient):
      • DIRC work.
      • Mark Dalton, to change one of the BCal fadc.
      • A. Somov, Vlad, Lubomir, Sergei and Arshak: work in the PS test area.
    • Tagger:

Tentative longer term run plan

  • 8h of RF recovery Wednesday Dec. 7th, from 8am to 4pm.
  • TAC run?
  • Luminosity study?
  • Fall 2022 run period ends on Dec. 19th, 7am.


Monday Dec. 5th

Last 72h

  • Friday, Saturday and Sunday were spent mostly with production on full target. 49 of ABU (Sat.7am - Monday 7am).
  • Biggest ABU loss occurred Saturday due to a dead hodoscope HV crate. Fixing it took a long time because we have no off-work-hours electronic support (see report below).
  • Hall C re-started running Friday around 8pm. Now Hall A, C and D are running concurrently.

Reports

Issues

Short term run plan

  • Empty target run?
  • Wednesday during RF recovery (Control Access should be sufficient):
    • DIRC work.
    • Beam off for more than 1h: rapid access for A. Somov, Vlad, Lubomir, Sergei and Arshak for oportunistic work in the PS test area.

Tentative longer term run plan

  • 8h of RF recovery Wednesday Dec. 7th, from 8am to 4pm.
  • TAC run?
  • Luminosity study?
  • Fall 2022 run period ends on Dec. 19th, 7am.

Friday Dec. 2nd

Last 24h

  • Thursday was spent mostly with production on full target. It was an efficient day, with 17.8h of ABU (7am-7am).
  • A. Somov did a low beam current test of the Active Colim. high gain in anticipation of a future TAC run. It looks good.
  • Hall C was supposed to get back to running in mid-swing shift, which would be followed by us doing Harp scans (last ones done: Oct. 21st), but it did not happen (Hall C vacuum issue).

Reports

Issues

  • The FDC fadc installed Wednesday by Naomi and Lubomir needed baseline calibration. Done during swing shift (Sergei/Lubomir).
  • cdc p_diff alarms are becoming rarer: 1 (day shift) + 1 (swing shift) + 0 reported in owl shift + 1 early riser.

Short term run plan

  • Hall C is expected to be back to running ??at some point??.
  • Harp scan after Hall C beam is tuned (last harps done on Nov. 21st, but Transmission is fine.)
  • FDC fadc: 20 min raw mode run with beam. Beni will analyse it and determine if the fadc needs to be replaced
  • If beam is off, we have opportunistic work:
    • Beam off for more than 1h: rapid access for A. Somov and Vlad for ??
    • Beam off for more than 2h: rapid access for Lubomir or Beni IF FDC fadc needs to be changed
    • Beam off for more than 2h and RadCon is available, need to survey fadc to removed them from the Hall (Lubomir/Codi)

Tentative longer term run plan

  • Possible RF recovery Wednesday Dec. 7th.
  • TAC run
  • Luminosity study

Thursday Dec. 1st

Last 24h

Reports

Issues

  • The new FDC fadc is worst than the one replaced (Naomi/Lubomir). The problem is only for raw mode run.
  • Many cdc p_diff alarms (e.g. 0.8 alarm/hour during swing and owl shifts) leading to runs often shorter than 2h (this has already been discussed several time. This is just a report).

Run plan

  • Hall C is expected to be back to running during swing shift today.
  • 20 min test at low beam current/high Active Colim. gain to see if adjustment are needed (A. Somov)?
  • Last harp scan was done on Nov. 21st. Should we do a new one? (Transmission is fine.)
  • Luminosity study?