(Created page with "[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard] [https://bluejeans.com/660743227 Meeting Bluejeans 660743227] [https://halldweb.jlab.org/data_monitoring/run_statis...")
 
(Thursday November 04)
Line 4: Line 4:
 
=Thursday November 04=
 
=Thursday November 04=
 
#Last 24h:
 
#Last 24h:
#* Maintenance day  
+
#* Maintenance day
 +
#* Replaced FCAL 15 bases [https://logbooks.jlab.org/entry/3936381]
 +
#* Restored beam at X:XXpm
 +
#* Harp scan
 
#* Recorded XXXM+ events with full LHe4 target
 
#* Recorded XXXM+ events with full LHe4 target
 
#Issues:
 
#Issues:

Revision as of 14:25, 3 November 2021

MCC whiteboard Meeting Bluejeans 660743227 Trigger Counter

Thursday November 04

  1. Last 24h:
    • Maintenance day
    • Replaced FCAL 15 bases [1]
    • Restored beam at X:XXpm
    • Harp scan
    • Recorded XXXM+ events with full LHe4 target
  2. Issues:
  3. Plan:
    • Continue production at 200nA with the solenoid on after that.
    • MCC (Jay) discussed possibility to move up the energy shift to Thu, swing
      • Controlled access planned for maintenance work (e.g. FCAL [2])
    • Beam energy change planned for 11/05-11/07
      • RadCon survey for Friday morning is requested
      • Safety Walkthrough scheduled for Friday 2pm