Difference between revisions of "Run Planning Meeting Notes, November 4 - November 10, 2021"

From GlueXWiki
Jump to: navigation, search
(Thursday November 04)
(Thursday November 04)
Line 2: Line 2:
 
[https://bluejeans.com/660743227 Meeting Bluejeans 660743227]
 
[https://bluejeans.com/660743227 Meeting Bluejeans 660743227]
 
[https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2021-08/index.html Trigger Counter]
 
[https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2021-08/index.html Trigger Counter]
 +
=Friday November 05=
 +
#Last 24h:
 +
#* Long accelerator down time due to power outage
 +
#* Recorded 150M+ events with full LHe4 target, end of PrimEx
 +
#Issues:
 +
# [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:]
 +
#* Beam energy change planned for 11/05-11/07, start Friday ~7am
 +
#** Cancel shifts from Friday 10am?
 +
#** RadCon survey for Friday morning is requested, leave hall in controlled, only survey tagger hall?
 +
#** Safety Walkthrough scheduled for Friday 2pm (Elton)
 +
#** Start SRC/CT on Monday, meeting at same time, but new number: 1234456
 +
 
=Thursday November 04=
 
=Thursday November 04=
 
#Last 24h:
 
#Last 24h:

Revision as of 12:05, 4 November 2021

MCC whiteboard Meeting Bluejeans 660743227 Trigger Counter

Friday November 05

  1. Last 24h:
    • Long accelerator down time due to power outage
    • Recorded 150M+ events with full LHe4 target, end of PrimEx
  2. Issues:
  3. Plan:
    • Beam energy change planned for 11/05-11/07, start Friday ~7am
      • Cancel shifts from Friday 10am?
      • RadCon survey for Friday morning is requested, leave hall in controlled, only survey tagger hall?
      • Safety Walkthrough scheduled for Friday 2pm (Elton)
      • Start SRC/CT on Monday, meeting at same time, but new number: 1234456

Thursday November 04

  1. Last 24h:
    • Maintenance day
    • Replaced FCAL 15 bases [1]
    • Restored beam at 11:00pm
    • Harp scan [2]
    • Recorded 150M+ events with full LHe4 target
    • Several beam interruptions, currently loss of power, might take a few hours to restore
  2. Issues:
    • CDC HV alarm at 2:45am, restored by itself for all but one channel (F:14), but HV OK, acknowledged
    • BCAL LED trigger script was off for runs 81702 and 82703. Switched on afterwards.
  3. Plan:
    • Continue production at 200nA with the solenoid on
    • Beam energy change planned for 11/05-11/07, start Friday ~7am
      • Cancel shifts from Friday 10am?
      • RadCon survey for Friday morning is requested, leave hall in controlled, only survey tagger hall?
      • Safety Walkthrough scheduled for Friday 2pm (Elton)
      • EEL Closure from November 5th, 6pm to November 8th, 6am and November 12th, 6pm to November 15th, 6am