Difference between revisions of "Run Planning Meeting Notes, November 4 - November 10, 2021"
From GlueXWiki
(→Friday November 05) |
(→Friday November 05) |
||
Line 5: | Line 5: | ||
#Last 24h: | #Last 24h: | ||
#* 7h accelerator down time due to power outage [https://logbooks.jlab.org/entry/3937004] | #* 7h accelerator down time due to power outage [https://logbooks.jlab.org/entry/3937004] | ||
+ | #* New modules installed in FCal2 test stand [https://logbooks.jlab.org/entry/3937087] (Sasha) | ||
#* Beam restored around 2pm | #* Beam restored around 2pm | ||
#* Trigger studies with 20nA and 100nA (Sasha) | #* Trigger studies with 20nA and 100nA (Sasha) |
Revision as of 07:40, 5 November 2021
MCC whiteboard Meeting Bluejeans 660743227 Trigger Counter
Friday November 05
- Last 24h:
- Issues:
- Plan:
- Beam energy change 11/05-11/07, start Friday 8am
- Cancel shifts from Friday 10am?
- RadCon survey for tagger halld done at 8am, leave hall and tagger in controlled
- Safety Walkthrough scheduled for Friday 2pm (Elton)
- Installation of Youri's detector near the PS on Sunday, calorimeter test has to go today?
- Maintenance of the A/C for the server room: shut off for more than 10min, ramp down servers?
- Start SRC/CT experiment on Monday
- Wiki page
- Morning meeting at same time, but new number: 497773790/1473
- Do we want to start a new run period 2021-11?
- Continue SRC/CT run plan discussion here
- Beam energy change 11/05-11/07, start Friday 8am
Thursday November 04
- Last 24h:
- Issues:
- CDC HV alarm at 2:45am, restored by itself for all but one channel (F:14), but HV OK, acknowledged
- BCAL LED trigger script was off for runs 81702 and 82703. Switched on afterwards.
- Plan:
- Continue production at 200nA with the solenoid on
- Beam energy change planned for 11/05-11/07, start Friday ~7am
- Cancel shifts from Friday 10am?
- RadCon survey for Friday morning is requested, leave hall in controlled, only survey tagger hall?
- Safety Walkthrough scheduled for Friday 2pm (Elton)
- EEL Closure from November 5th, 6pm to November 8th, 6am and November 12th, 6pm to November 15th, 6am