(Friday November 05)
(Monday November 08)
Line 5: Line 5:
  
 
#Last 72h:
 
#Last 72h:
#* Accelerator beam energy change started Friday 8am, completed XXX
+
#* Accelerator beam energy change started Friday 8am
#* New run period started: 2021-11
+
#* New run period started: 2021-11, runs 90000+
 +
#* Solenoid coil4 vacuum degraded on Friday afternoon [https://logbooks.jlab.org/entry/3937615], lead to dump at 9pm [https://logbooks.jlab.org/entry/3937754]
 +
#* Accelerator reconfiguration completed on Sunday
 
#Reports
 
#Reports
 
#Issues
 
#Issues
 
#Plans
 
#Plans
 
  
 
=Friday November 05=
 
=Friday November 05=

Revision as of 10:48, 6 November 2021

MCC whiteboard Meeting Bluejeans 660743227 Trigger Counter

Monday November 08

  1. Last 72h:
    • Accelerator beam energy change started Friday 8am
    • New run period started: 2021-11, runs 90000+
    • Solenoid coil4 vacuum degraded on Friday afternoon [1], lead to dump at 9pm [2]
    • Accelerator reconfiguration completed on Sunday
  2. Reports
  3. Issues
  4. Plans

Friday November 05

  1. Last 24h:
    • 7h accelerator down time due to power outage [3]
    • New modules installed in FCal2 test stand [4] (Sasha)
    • Beam restored around 2pm
    • Trigger studies with 20nA and 100nA (Sasha)
    • Recorded 800M+ events with full lHe4 target
    • 8am: PrimEx EoR
  2. Issues: -
  3. Reports:
    • Normalized rates [5] and beam energy [6](Alexandre)
  4. Plan:
    • Beam energy change 11/05-11/07, start Friday 8am
      • Cancel shifts from Friday 10am
      • RadCon survey for tagger halld done at 8am, leave hall and tagger in controlled
      • Safety Walkthrough scheduled for Friday 2pm (Elton)
      • Installation of Youri's detector near the PS on Sunday, calorimeter test has to go today?
      • Maintenance of the A/C for the server room: cancelled
    • Start SRC/CT experiment on Monday
      • Wiki page
      • Morning meeting at same time, but new number: 497773790/1473
      • Do we want to start a new run period 2021-11?
      • Continue SRC/CT run plan discussion here

Thursday November 04

  1. Last 24h:
    • Maintenance day
    • Replaced FCAL 15 bases [7]
    • Restored beam at 11:00pm
    • Harp scan [8]
    • Recorded 150M+ events with full LHe4 target
    • Several beam interruptions, currently loss of power, might take a few hours to restore
  2. Issues:
    • CDC HV alarm at 2:45am, restored by itself for all but one channel (F:14), but HV OK, acknowledged
    • BCAL LED trigger script was off for runs 81702 and 82703. Switched on afterwards.
  3. Plan:
    • Continue production at 200nA with the solenoid on
    • Beam energy change planned for 11/05-11/07, start Friday ~7am
      • Cancel shifts from Friday 10am?
      • RadCon survey for Friday morning is requested, leave hall in controlled, only survey tagger hall?
      • Safety Walkthrough scheduled for Friday 2pm (Elton)
      • EEL Closure from November 5th, 6pm to November 8th, 6am and November 12th, 6pm to November 15th, 6am