Difference between revisions of "Run Planning Meeting Notes, Oct 11-Oct 17, 2018"

From GlueXWiki
Jump to: navigation, search
(Thursday, Oct 11 at 08:45)
Line 8: Line 8:
 
#Action Items
 
#Action Items
 
#Issues
 
#Issues
#*Need to schedule a TAC run
 
#** Can we do this opportunistically?
 
#** Use bleedthrough current?
 
#** Hall C plans to switch experiments on approximately the 22nd. This is around the time of accelerator maintenance, so they may plan to switch experiments then.
 
 
#*[https://logbooks.jlab.org/entry/3607331  MyaViewer missing events ]
 
#*[https://logbooks.jlab.org/entry/3607331  MyaViewer missing events ]
 
#* [https://logbooks.jlab.org/entry/3607600 Lots of issues with DAQ- rocCDC2]
 
#* [https://logbooks.jlab.org/entry/3607600 Lots of issues with DAQ- rocCDC2]
Line 19: Line 15:
 
#*[https://logbooks.jlab.org/entry/3607032 Rate and Energy Monitoring]
 
#*[https://logbooks.jlab.org/entry/3607032 Rate and Energy Monitoring]
 
#Run Plan
 
#Run Plan
 +
#*Need to schedule a TAC run
 +
#** Can we do this opportunistically?
 +
#** Use bleedthrough current?
 +
#** Hall C plans to switch experiments on approximately the 22nd. This is around the time of accelerator maintenance, so they may plan to switch experiments then.
 
#* Hurricane Michael closely approaching. Do we need to take any precautions?
 
#* Hurricane Michael closely approaching. Do we need to take any precautions?
 
#* [https://halldweb.jlab.org/wiki/images/d/de/Fall18_week4.jpg Week 4] [https://halldweb.jlab.org/wiki/index.php/File:Fall18_week5.jpg Week 5]
 
#* [https://halldweb.jlab.org/wiki/images/d/de/Fall18_week4.jpg Week 4] [https://halldweb.jlab.org/wiki/index.php/File:Fall18_week5.jpg Week 5]

Revision as of 08:22, 11 October 2018

Thursday, Oct 11 at 08:45

  1. Notes from the past 24 hours:
    • Beam issues most of swing (7hrs to do amorphous run) and owl shift.
  1. CEBAF
    • 5th pass separator failed during swing shift and into the beginning of owl. Beam back at 3:20am.
    • PSS drop in the machine at 3:30 am. No beam until 6am.
  2. Action Items
  3. Issues
  4. Reports
  5. Run Plan
    • Need to schedule a TAC run
      • Can we do this opportunistically?
      • Use bleedthrough current?
      • Hall C plans to switch experiments on approximately the 22nd. This is around the time of accelerator maintenance, so they may plan to switch experiments then.
    • Hurricane Michael closely approaching. Do we need to take any precautions?
    • Week 4 Week 5
      • Beam Studies Monday
      • RF Recovery Monday
  6. AOB