(Thursday, Oct 11 at 08:45)
Line 13: Line 13:
 
#*[https://logbooks.jlab.org/entry/3607590 Monitoring Report]
 
#*[https://logbooks.jlab.org/entry/3607590 Monitoring Report]
 
#* [https://halldweb.jlab.org/data_monitoring/Plot_Browser.html Plot Browser]  
 
#* [https://halldweb.jlab.org/data_monitoring/Plot_Browser.html Plot Browser]  
#*[https://logbooks.jlab.org/entry/3607032 Rate and Energy Monitoring]
 
 
#Run Plan
 
#Run Plan
 
#*Need to schedule a TAC run
 
#*Need to schedule a TAC run

Revision as of 08:39, 11 October 2018

Thursday, Oct 11 at 08:45

  1. Notes from the past 24 hours:
    • Beam issues most of swing (7hrs to complete amorphous run) and owl shift (~1hr of beam in total).
  2. CEBAF
    • 5th pass separator failed during swing shift and remained problematic into the beginning of owl. Beam back at 3:20am.
    • PSS drop in the machine at 3:30 am. No beam until 6am.
  3. Action Items
  4. Issues
  5. Reports
  6. Run Plan
    • Need to schedule a TAC run
      • Can we do this opportunistically?
      • Use bleedthrough current?
      • Hall C plans to switch experiments on approximately the 22nd. This is around the time of accelerator maintenance, so they may plan to switch experiments then.
    • Hurricane Michael closely approaching. Do we need to take any precautions?
    • Week 4 Week 5
      • Beam Studies Monday
      • RF Recovery Tuesday
  7. AOB