(Thursday, Oct 11 at 08:45)
Line 1: Line 1:
 +
== Friday, Oct 12 at 08:45 ==
 +
# Notes from the past 24 hours:
 +
#* Beam back at 11:30 am, Sasha finished L1 trigger studies by 2:00 pm
 +
#* MCC suggests they recalibrate iIon chamber to reduce trip rates. Previously, it was only calibrated up to 80 nA.
 +
#* Sergey performed high rate DAQ tests with current up to 900 nA (want to try at 1 uA?)
 +
#* [https://logbooks.jlab.org/entry/3607777 David has new online monitoring site up]
 +
#CEBAF
 +
#*
 +
#Action Items
 +
#Issues
 +
#* Multiple alarms for BCAL downstream environmental sensors. Elton contacts Nick who reports [https://logbooks.jlab.org/entry/3607819 downstream BCAL PLC -Ethernet port quit]. Access needed.
 +
#Reports
 +
#*[https://logbooks.jlab.org/entry/3607590 Monitoring Report]
 +
#* [https://halldweb.jlab.org/data_monitoring/Plot_Browser.html Plot Browser]
 +
#* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1865737386 Statistics Spreadsheet]
 +
#Run Plan
 +
#*Need to schedule a TAC run
 +
#** Can we do this opportunistically?
 +
#** Use bleedthrough current?
 +
#** Hall C plans to switch experiments on approximately the 22nd. This is around the time of accelerator maintenance, so they may plan to switch experiments then.
 +
#* Hurricane Michael arriving this evening. Do we need to take any precautions?
 +
#* [https://halldweb.jlab.org/wiki/images/d/de/Fall18_week4.jpg Week 4] [https://halldweb.jlab.org/wiki/index.php/File:Fall18_week5.jpg Week 5]
 +
#**Beam Studies Monday
 +
#**RF Recovery Tuesday
 +
 
== Thursday, Oct 11 at 08:45 ==
 
== Thursday, Oct 11 at 08:45 ==
 
# Notes from the past 24 hours:
 
# Notes from the past 24 hours:

Revision as of 20:00, 11 October 2018

Friday, Oct 12 at 08:45

  1. Notes from the past 24 hours:
    • Beam back at 11:30 am, Sasha finished L1 trigger studies by 2:00 pm
    • MCC suggests they recalibrate iIon chamber to reduce trip rates. Previously, it was only calibrated up to 80 nA.
    • Sergey performed high rate DAQ tests with current up to 900 nA (want to try at 1 uA?)
    • David has new online monitoring site up
  2. CEBAF
  3. Action Items
  4. Issues
  5. Reports
  6. Run Plan
    • Need to schedule a TAC run
      • Can we do this opportunistically?
      • Use bleedthrough current?
      • Hall C plans to switch experiments on approximately the 22nd. This is around the time of accelerator maintenance, so they may plan to switch experiments then.
    • Hurricane Michael arriving this evening. Do we need to take any precautions?
    • Week 4 Week 5
      • Beam Studies Monday
      • RF Recovery Tuesday

Thursday, Oct 11 at 08:45

  1. Notes from the past 24 hours:
    • Beam issues most of swing (7hrs to complete amorphous run) and owl shift (~1hr of beam in total).
  2. CEBAF
    • 5th pass separator failed during swing shift and remained problematic into the beginning of owl. Beam back at 3:20am.
    • PSS drop in the machine at 3:30 am. No beam until 6am.
  3. Action Items
  4. Issues
  5. Reports
  6. Run Plan
    • Need to schedule a TAC run
      • Can we do this opportunistically?
      • Use bleedthrough current?
      • Hall C plans to switch experiments on approximately the 22nd. This is around the time of accelerator maintenance, so they may plan to switch experiments then.
    • Hurricane Michael arriving this evening. Do we need to take any precautions?
    • Week 4 Week 5
      • Beam Studies Monday
      • RF Recovery Tuesday
  7. AOB