(Thursday, Oct 11 at 08:45)
Line 1: Line 1:
 
== Thursday, Oct 11 at 08:45 ==
 
== Thursday, Oct 11 at 08:45 ==
 
# Notes from the past 24 hours:
 
# Notes from the past 24 hours:
#*  
+
#* Beam issues most of swing and owl shift
 
#CEBAF
 
#CEBAF
#*
+
#* 5th pass separator during swing shift and beginning of owl. Beam back at 3:20am
 +
#* PSS drop in the machine at 3:30 am. No beam until 6am
 
#Action Items
 
#Action Items
 
#Issues
 
#Issues
Line 13: Line 14:
 
#*[https://logbooks.jlab.org/entry/3607032 Rate and Energy Monitoring]
 
#*[https://logbooks.jlab.org/entry/3607032 Rate and Energy Monitoring]
 
#Run Plan
 
#Run Plan
 +
#* Hurricane Michael closely approaching. Do we need to take any precautions?
 
#* [https://halldweb.jlab.org/wiki/images/4/49/Fall18_week3.jpg Week 3] [https://halldweb.jlab.org/wiki/images/d/de/Fall18_week4.jpg Week 4]
 
#* [https://halldweb.jlab.org/wiki/images/4/49/Fall18_week3.jpg Week 3] [https://halldweb.jlab.org/wiki/images/d/de/Fall18_week4.jpg Week 4]
 
#**Beam Studies Monday
 
#**Beam Studies Monday

Revision as of 07:08, 11 October 2018

Thursday, Oct 11 at 08:45

  1. Notes from the past 24 hours:
    • Beam issues most of swing and owl shift
  2. CEBAF
    • 5th pass separator during swing shift and beginning of owl. Beam back at 3:20am
    • PSS drop in the machine at 3:30 am. No beam until 6am
  3. Action Items
  4. Issues
  5. Reports
  6. Run Plan
    • Hurricane Michael closely approaching. Do we need to take any precautions?
    • Week 3 Week 4
      • Beam Studies Monday
      • RF Recovery Monday
  7. AOB