(Thursday, Oct 11 at 08:45)
(Thursday, Oct 11 at 08:45)
Line 2: Line 2:
 
# Notes from the past 24 hours:
 
# Notes from the past 24 hours:
 
#* Beam issues most of swing (7hrs to do amorphous run) and owl shift.
 
#* Beam issues most of swing (7hrs to do amorphous run) and owl shift.
 +
 
#CEBAF
 
#CEBAF
 
#* 5th pass separator failed during swing shift and into the beginning of owl. Beam back at 3:20am.
 
#* 5th pass separator failed during swing shift and into the beginning of owl. Beam back at 3:20am.

Revision as of 07:21, 11 October 2018

Thursday, Oct 11 at 08:45

  1. Notes from the past 24 hours:
    • Beam issues most of swing (7hrs to do amorphous run) and owl shift.
  1. CEBAF
    • 5th pass separator failed during swing shift and into the beginning of owl. Beam back at 3:20am.
    • PSS drop in the machine at 3:30 am. No beam until 6am.
  2. Action Items
  3. Issues
  4. Reports
  5. Run Plan
    • Hurricane Michael closely approaching. Do we need to take any precautions?
    • Week 3 Week 4
      • Beam Studies Monday
      • RF Recovery Monday
  6. AOB