(Thursday, Oct 11 at 08:45)
(Thursday, Oct 11 at 08:45)
Line 9: Line 9:
 
#Issues
 
#Issues
 
#*Need to schedule a TAC run
 
#*Need to schedule a TAC run
 +
#** Can we do this opportunistically?
 +
#** Use bleedthrough current?
 +
#** Hall C plans to switch experiments on approximately the 22nd. This is around the time of accelerator maintenance, so they may plan to switch experiments then.
 
#*[https://logbooks.jlab.org/entry/3607331  MyaViewer missing events ]
 
#*[https://logbooks.jlab.org/entry/3607331  MyaViewer missing events ]
 
#Reports
 
#Reports
#*[https://logbooks.jlab.org/entry/3607042 Monitoring Report]
+
#*[ Monitoring Report]
 
#* [https://halldweb.jlab.org/data_monitoring/Plot_Browser.html Plot Browser]  
 
#* [https://halldweb.jlab.org/data_monitoring/Plot_Browser.html Plot Browser]  
 
#*[https://logbooks.jlab.org/entry/3607032 Rate and Energy Monitoring]
 
#*[https://logbooks.jlab.org/entry/3607032 Rate and Energy Monitoring]

Revision as of 08:19, 11 October 2018

Thursday, Oct 11 at 08:45

  1. Notes from the past 24 hours:
    • Beam issues most of swing (7hrs to do amorphous run) and owl shift.
  1. CEBAF
    • 5th pass separator failed during swing shift and into the beginning of owl. Beam back at 3:20am.
    • PSS drop in the machine at 3:30 am. No beam until 6am.
  2. Action Items
  3. Issues
    • Need to schedule a TAC run
      • Can we do this opportunistically?
      • Use bleedthrough current?
      • Hall C plans to switch experiments on approximately the 22nd. This is around the time of accelerator maintenance, so they may plan to switch experiments then.
    • MyaViewer missing events
  4. Reports
  5. Run Plan
    • Hurricane Michael closely approaching. Do we need to take any precautions?
    • Week 3 Week 4
      • Beam Studies Monday
      • RF Recovery Monday