Difference between revisions of "Run Planning Meeting Notes, Oct 11-Oct 17, 2018"
From GlueXWiki
(→Thursday, Oct 11 at 08:45) |
(→Thursday, Oct 11 at 08:45) |
||
Line 7: | Line 7: | ||
#Action Items | #Action Items | ||
#Issues | #Issues | ||
+ | #* [https://logbooks.jlab.org/entry/3607263 Tail on one side of beam in x and y.] [https://logbooks.jlab.org/entry/3607283 Richard gives a nice explanation of what may be happening. Beam OK for now.] Should we ask for a retune before the weekend? | ||
#*[https://logbooks.jlab.org/entry/3607331 MyaViewer missing events ] | #*[https://logbooks.jlab.org/entry/3607331 MyaViewer missing events ] | ||
#* [https://logbooks.jlab.org/entry/3607600 Lots of issues with DAQ- rocCDC2] | #* [https://logbooks.jlab.org/entry/3607600 Lots of issues with DAQ- rocCDC2] |
Revision as of 08:31, 11 October 2018
Thursday, Oct 11 at 08:45
- Notes from the past 24 hours:
- Beam issues most of swing (7hrs to complete amorphous run) and owl shift (~1hr of beam in total).
- CEBAF
- 5th pass separator failed during swing shift and remained problematic into the beginning of owl. Beam back at 3:20am.
- PSS drop in the machine at 3:30 am. No beam until 6am.
- Action Items
- Issues
- Tail on one side of beam in x and y. Richard gives a nice explanation of what may be happening. Beam OK for now. Should we ask for a retune before the weekend?
- MyaViewer missing events
- Lots of issues with DAQ- rocCDC2
- Reports
- Run Plan
- Need to schedule a TAC run
- Can we do this opportunistically?
- Use bleedthrough current?
- Hall C plans to switch experiments on approximately the 22nd. This is around the time of accelerator maintenance, so they may plan to switch experiments then.
- Hurricane Michael closely approaching. Do we need to take any precautions?
- Week 4 Week 5
- Beam Studies Monday
- RF Recovery Monday
- Need to schedule a TAC run
- AOB