== Wednesday, Oct 24 at 08:45 ==
 +
# Last 24h
 +
#* Beam back after RF-Studies,11:30am
 +
#* TAC run 12:30 to 18:30; partial success, limited statistics, bleed through from Hall A
 +
#* Require TAC data analysis to assess quality and statistics level
 +
#* reasonable smooth data taking over night.
 +
# Reports:
 +
#* [https://logbooks.jlab.org/entry/3614211 Monitoring]
 +
#* [https://logbooks.jlab.org/entry/3614203 DAQ Trigger Rates with diamonds]
 +
#* minor DAQ issues usually roctrig2
 +
# Plans next few days
 +
#* FAC. Dev.: shifts on standby today 8am till tomorrow 16:00
 +
#* further details of progress in Fac.Dev. by tomorrow noon.
 +
#* HallD will go to Restricted Access tomorrow morning.
 +
#** For any work in the hall contact Mark Stevens
 +
#* Resume physics data taking over the week end
 +
#** Requires good beam tune (harp scans)
 +
# AoB
 +
#* TAILGATE PARTY THIS AFTERNOON!
 +
 +
== Tuesday, Oct 23 at 08:45 ==
 +
# Last 24h
 +
#* After Beam Studies got beam back around 15:30; good data taking [https://logbooks.jlab.org/entry/3613538 so freakin good beam !!!]
 +
#* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1865737386 Statistics Spreadsheet]
 +
# Issues
 +
#* Beam energy: [https://logbooks.jlab.org/entry/3613677 logbook entry 3613677]
 +
#* Monitoring: [https://logbooks.jlab.org/entry/3613687 logbook entry 3613687]
 +
# Plan Today
 +
#* RF Recovery only 2h
 +
#* TAC run when beam back (HallC Aerogel installation at least 6h; TAC run with foil! Todd and Mike are available nano BPM should still be up and running with valid calibration.
 +
#* Empty target in prep for TAC run.
 +
# Week forecast
 +
#* Facility development (minimal beam energy spread for hallA beam requirements): Wed. 8am to Thu. 3pm, detailed schedule will be available by 2:30pm this afternoon
 +
#* [https://halldweb.jlab.org/wiki/index.php/File:Fall18_week5.jpg Week 5]
 +
#* [https://halldweb.jlab.org/wiki/index.php/File:Fall18_week6.jpg Week 6]
 +
#* [https://halldweb.jlab.org/wiki-private/index.php/2018_Low_energy_measurements Low energy beam running for this Fall 2018]: discussion today at bi-weekly Gluex Meeting!
 +
#AoB
 +
 +
== Monday, Oct 22 at 08:45 ==
 +
# This past week end
 +
#* quite smooth running: [https://logbooks.jlab.org/entry/3612992 beam over the week end]
 +
#* Friday beam tune by Todd: [https://logbooks.jlab.org/entry/3611925 elog entry]
 +
# Issues over the week end
 +
#* DAQ, gluon04, No PS-trigger on display (DAQ-trigger ok!)
 +
#* [https://logbooks.jlab.org/entry/3613012 Data Monitoring]
 +
#* [https://logbooks.jlab.org/entry/3613021 FCAL performance]
 +
#* beam intensity issues this morning 7am .... Moday morning start of the work day
 +
# Today:
 +
#* Safety walk through
 +
#* [https://logbooks.jlab.org/entry/3613003 Tagger beam line vacuum]
 +
#* After noon beam setup for running. (Todd)
 +
# Week beam forecast
 +
#* Mon. Beam studies, Tue. RF-recovery, Wed.-Thu. Acc. Dev. for HallA
 +
#* Shifts on Standby from Wed. 8am to Thu. 4pm??
 +
#* [https://halldweb.jlab.org/wiki/index.php/File:Fall18_week5.jpg Week 5]
 +
#* [https://halldweb.jlab.org/wiki/index.php/File:Fall18_week6.jpg Week 6]
 +
# AoB?
 +
 +
== Friday, Oct 19 at 08:45 ==
 +
# Notes from the past 24 hours:
 +
#* Alignment of JD70-105 47um in 10 hours. THANKS TO HOVANES!
 +
#** [https://logbooks.jlab.org/entry/3611673 Coherent Peak New Diamond]
 +
#* Amo run taken
 +
#* Harp scan taken: same beam conditions as on Wednesday evening
 +
#* PARA and PERP at 0/90 with new diamond in the books!
 +
#* [https://logbooks.jlab.org/entry/3611763 Beam last 24h]
 +
# Report:
 +
#* [https://logbooks.jlab.org/entry/3611752 Frequent drop of beam energy measurement]
 +
#* [https://logbooks.jlab.org/entry/3611794 Data Rates on New Diamond]
 +
#* [https://logbooks.jlab.org/entry/3611784 Data Monitoring]
 +
# Actions Required:
 +
#* TAKE DATA!
 +
# Weekly Beam forecast: [https://cebaf.jlab.org/files/ops/accboard/ CEBAF-WhiteBoard]
 +
#* HallA machine development (Tue.-Wed) may shift to Mon.-Tue.!
 +
# Run Plan:
 +
#* Run with no radiator at high current (Lubomir)
 +
#** Raw mode, LED (FP) trigger to 5kHz!
 +
#* [https://halldweb.jlab.org/wiki/index.php/File:Fall18_week5.jpg Week 5]
 +
#* [https://halldweb.jlab.org/wiki/index.php/File:Fall18_week6.jpg Week 6]
 +
# WTFATRC
 +
#* NEED RC in 2 weeks!
 +
# ANY other business
 +
 
== Thursday, Oct 18 at 08:45 ==
 
== Thursday, Oct 18 at 08:45 ==
 
# Notes from the past 24 hours:
 
# Notes from the past 24 hours:
Line 17: Line 100:
 
#* RF recovery Tuesday, HallC aerogel installation
 
#* RF recovery Tuesday, HallC aerogel installation
 
#* Wednesday 7am(?) to Thursday  midnight Hall-A beam tune. No beam or only parasitic other halls.
 
#* Wednesday 7am(?) to Thursday  midnight Hall-A beam tune. No beam or only parasitic other halls.
 +
#** take advantage of down for installations?
 
#* TAC postpone to Friday 10/26?????
 
#* TAC postpone to Friday 10/26?????
 
# Reports:
 
# Reports:

Latest revision as of 08:33, 24 October 2018

Wednesday, Oct 24 at 08:45

  1. Last 24h
    • Beam back after RF-Studies,11:30am
    • TAC run 12:30 to 18:30; partial success, limited statistics, bleed through from Hall A
    • Require TAC data analysis to assess quality and statistics level
    • reasonable smooth data taking over night.
  2. Reports:
  3. Plans next few days
    • FAC. Dev.: shifts on standby today 8am till tomorrow 16:00
    • further details of progress in Fac.Dev. by tomorrow noon.
    • HallD will go to Restricted Access tomorrow morning.
      • For any work in the hall contact Mark Stevens
    • Resume physics data taking over the week end
      • Requires good beam tune (harp scans)
  4. AoB
    • TAILGATE PARTY THIS AFTERNOON!

Tuesday, Oct 23 at 08:45

  1. Last 24h
  2. Issues
  3. Plan Today
    • RF Recovery only 2h
    • TAC run when beam back (HallC Aerogel installation at least 6h; TAC run with foil! Todd and Mike are available nano BPM should still be up and running with valid calibration.
    • Empty target in prep for TAC run.
  4. Week forecast
  5. AoB

Monday, Oct 22 at 08:45

  1. This past week end
  2. Issues over the week end
    • DAQ, gluon04, No PS-trigger on display (DAQ-trigger ok!)
    • Data Monitoring
    • FCAL performance
    • beam intensity issues this morning 7am .... Moday morning start of the work day
  3. Today:
  4. Week beam forecast
    • Mon. Beam studies, Tue. RF-recovery, Wed.-Thu. Acc. Dev. for HallA
    • Shifts on Standby from Wed. 8am to Thu. 4pm??
    • Week 5
    • Week 6
  5. AoB?

Friday, Oct 19 at 08:45

  1. Notes from the past 24 hours:
    • Alignment of JD70-105 47um in 10 hours. THANKS TO HOVANES!
    • Amo run taken
    • Harp scan taken: same beam conditions as on Wednesday evening
    • PARA and PERP at 0/90 with new diamond in the books!
    • Beam last 24h
  2. Report:
  3. Actions Required:
    • TAKE DATA!
  4. Weekly Beam forecast: CEBAF-WhiteBoard
    • HallA machine development (Tue.-Wed) may shift to Mon.-Tue.!
  5. Run Plan:
    • Run with no radiator at high current (Lubomir)
      • Raw mode, LED (FP) trigger to 5kHz!
    • Week 5
    • Week 6
  6. WTFATRC
    • NEED RC in 2 weeks!
  7. ANY other business

Thursday, Oct 18 at 08:45

  1. Notes from the past 24 hours:
  2. Actions Required:
    • photon beam, coherent peak!
    • need good beam AND diamond for the week end!
  3. Weekly Beam forecast: CEBAF-WhiteBoard
    • Beam studies Monday, HallC 4hour access
    • RF recovery Tuesday, HallC aerogel installation
    • Wednesday 7am(?) to Thursday midnight Hall-A beam tune. No beam or only parasitic other halls.
      • take advantage of down for installations?
    • TAC postpone to Friday 10/26?????
  4. Reports:
  5. Run Plan